Laserfiche WebLink
THE FOLLOWING WOODY PLANT DENSITY REVEGETATION SUCCESS STANDARD IS <br />PROPOSED BY THE DIVISION FOR THE MCCLANE CANYON MINE: 500 STEMS/ACRE <br />FOR THE GREASEWOOD SHRUBLAND AND SHADSCALE SHRUBLAND <br />COMMUNITIES, AND 2,000 STEMS/ACRE FOR THE JUNIPER WOODLAND <br />COMMUNITY. WITHIN 60 DAYS OF PERMIT ISSUANCE THE PERMITTEE SHALL <br />EITHER REVISE THE PERMIT APPLICATION TO COMMIT TO USE OF THIS <br />STANDARD OR COMMIT TO USE OF AN ALTERNATE STANDARD AGREED UPON IN <br />CONSULTATION WITH THE DIVISION. <br />Status: This stipulation was satisfied and terminated on January 9, 1987. <br />Stipulation No. 9 <br />THE FOLLOWING SPECIES DIVERSITY REVEGETATION SUCCESS STANDARD <br />ISPROPOSED BY THE DIVISION FOR ALL REVEGETATED AREAS AT THE MCCLANE <br />CANYON MINE: 3 COOL SEASON GRASSES, 2 WARM SEASON GRASSES, AND TWO <br />FORBS BE ESTABLISHED, AT MINIMUM; NO ONE SPECIES OF WHICH IS TO <br />COMPRISE MORE THAN 40% OF THE RELATIVE VEGETATIVE COVER. WITHIN <br />60DAYS OF PERMIT ISSUANCE, THE PERMITTEE SHALL EITHER REVISE THE PERMIT <br />SPPLICATION COMMIT TO USE OF THIS STANDARD OR COMMIT TO USE OF AN <br />ALTERNATE STANDARD AGREED UPON IN CONSULTATION WITH THE DIVISION. <br />Status: This stipulation was satisfied and terminated on January 9, 1987. <br />Stipulation No. 10 <br />WITHIN 60 DAYS OF PERMIT ISSUANCE, THE PERMITTEE SHALL REVISE THE PERMIT <br />APPLICATION TO INCLUDE THE ANNUAL REVEGETATION MONITORING PROGRAM <br />PROPOSED FOR THE MUNGER CANYON MINE IN THE APRIL 18, 1983LETTER TO THE <br />DIVISION FORM SHERIDAN ENTERPRISES. THE PROGRAM SHALL BE INITIATED THE <br />SECOND YEAR AFTER INITIAL PERMANENT REVEGETATION SEEDING OF ANY AREA <br />AT THE MCCLANE CANYON MINE. <br />Status: This stipulation was satisfied and terminated on January 9, 1987. <br />Stipulation No. 11 <br />WITHIN 60 DAYS OF PERMIT ISSUANCE, THE APPLICANT SHALL REVISE THE PERMIT <br />APPLICATION TO COMMIT TO BACKFILLING THE PORTAL FACE -UP AREA TO THE <br />ORIGINAL "STRAND LINE" OR CREST LINE OF THE ORIGINAL UNDISTURBED SLOPE <br />WHICH WAS EXCAVATED OUT DURING CONSTRUCTION OF THE MINE BENCH AND <br />PORTALS. THE SLOPE GRADIENT AND COMPACTION OF THE BACKFILLED PORTAL <br />FACE -UP AREA SHALL BE DESIGNED TO ACHIEVE A MINIMUM STATIC SLOPE <br />SAFETY FACTOR OF L3. <br />Status: This stipulation was satisfied and terminated on January 9, 1987. <br />Stipulation No. 12 <br />7 <br />