Laserfiche WebLink
(e) An approximate timetable to describe the mining operation: <br /> This is an ongoing mining operation. The expected life of the amendment area is 6 to 14 <br /> years depending on market demand. We estimate the amount of mineable acres by phase <br /> is as follows: <br /> Table 1: Phase, Mineable Acres and Timetable <br /> Phase Approximate Mineable Approximate <br /> Acres Production Period <br /> -Years <br /> 1 4.0 1.3 <br /> 2 6.0 2.0 <br /> 3 6.0 2.0 <br /> 4 5.0 1.7 <br /> 5 2.5 .8 <br /> 6 2.5 .8 <br /> (i) An estimate of the periods of time which will be required for the various <br /> phases: <br /> Please see the above Table 1. <br /> (ii) A description of the size and location of each area to be worked during each <br /> phase: <br /> Please see the Pre-mine/Mine Plan map and the above Table 1. <br /> (iii) Outline the sequence in which each phase of the operation will be carried <br /> out: <br /> Please see the Pre-mine/Mine Plan map and the above Table 1. <br /> (f) The Exhibit C map may be used along with the narrative to present the <br /> following information: <br /> The Operator considers the following information, (fi(i) and(ii) as confidential <br /> (i) Nature, depth and thickness of the deposit to be mined and thickness and <br /> type of overburden: <br /> The material to be mined is sand and gravel. Dependent upon the soils unit being <br /> mined, it varies in depth from being a surface material of a few inches thick,to <br /> approximately 20 feet deep. The sand and gravel resource in the soils unit Sa is the <br /> 30 <br />