My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-30_REVISION - C2010089
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2017-01-30_REVISION - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2017 11:10:57 AM
Creation date
1/30/2017 10:31:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
1/30/2017
Doc Name
Adequacy Review Memo and RCE
From
Jason Musick
To
Brock Bowles
Type & Sequence
RN1
Email Name
JDM
DIH
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 10 of 150 <br /> <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br /> <br />Task description: Regrade Trailing Spoil Ridges <br />Site: New Horizon North Mine Permit Action: RN1 Permit/Job#: C2010089 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado Abbreviation: None <br />Date: 1/27/2017 County: Montrose Filename: C089-003 <br />User: JDM <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D11T - 11U <br />Horsepower: 850 <br />Blade Type: Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $222.81 NA <br />Operating Cost/Hour: $218.91 100 <br />Ripper own. <br />Cost/Hour: $0.00 NA <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $38.89 NA <br />Total unit Cost/Hour: $480.61 <br />Total Fleet Cost/Hour: $961.22 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 2,750,000 <br />Swell factor: 1.000 <br />Loose volume: 2,750,000 LCY <br />Source of estimated volume: Map 2.05.2-1; Section 2.05.4(2)(c) <br />Source of estimated swell <br />factor: <br />Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 300 feet <br />Unadjusted hourly <br />production: <br />1,055.6 LCY/hr <br /> <br />Materials consistency description: Partly consolidated stockpile 1.1 <br /> <br />Average push <br />gradient: <br />-25 % <br />Average site altitude: 5,000 feet <br /> <br />Material weight: 2,550 lbs/LCY <br /> <br />Weight description: Sandstone
The URL can be used to link to this page
Your browser does not support the video tag.