Laserfiche WebLink
Page 11 of 150 <br /> <br />CIRCES Cost Estimating Software <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.100 (CAT HB) <br />Dozing method: 1.100 (50% SL) <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 1.000 (DOZ-OC) <br />Push gradient: 1.516 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material Weight: 0.902 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 1.0300 <br /> <br />Adjusted unit <br />production: 1,087.27 LCY/hr <br />Adjusted fleet <br />production: 2174.54 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.442/LCY <br /> <br />Total job time: 1,264.64 Hours <br />Total job cost: $1,215,594 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />