My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-30_REVISION - C2010089
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2017-01-30_REVISION - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2017 11:10:57 AM
Creation date
1/30/2017 10:31:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
1/30/2017
Doc Name
Adequacy Review Memo and RCE
From
Jason Musick
To
Brock Bowles
Type & Sequence
RN1
Email Name
JDM
DIH
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 11 of 150 <br /> <br />CIRCES Cost Estimating Software <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.100 (CAT HB) <br />Dozing method: 1.100 (50% SL) <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 1.000 (DOZ-OC) <br />Push gradient: 1.516 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material Weight: 0.902 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 1.0300 <br /> <br />Adjusted unit <br />production: 1,087.27 LCY/hr <br />Adjusted fleet <br />production: 2174.54 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.442/LCY <br /> <br />Total job time: 1,264.64 Hours <br />Total job cost: $1,215,594 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.