Laserfiche WebLink
Page 9 of 150 <br /> <br />CIRCES Cost Estimating Software <br />Truck Cycle Time: <br />Truck Exchange Time: 0.80 Minutes Adjusted for site altitude: 0.800 Minutes <br />Truck Load Time: 2.280 Minutes Adjusted for site altitude: 2.280 Minutes <br />Truck Maneuver and Dump <br />Time: <br />1.20 Minutes Adjusted for site altitude: 1.200 Minutes <br /> <br />Truck Travel (Haul & Return) Time: Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, <br />maintained 3.0 <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 5000.00 0.00 3.00 3.00 2409 2.512 <br />Haul Time: 2.512 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 5000.00 0.00 3.00 3.00 3503 1.699 <br />Return Time: 1.699 minutes <br />Total Truck Cycle Time: 8.491 minutes <br />Loading Tool unit <br />Production <br /> <br />1,363.64 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />1,131.82 <br /> <br />LCY/Hour <br />Truck Unit Production <br />494.64 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />410.55 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />3 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />3 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 1,231.66 LCY/Hour <br />Adjusted single truck/loader team production: 1,131.82 LCY/Hour <br />Adjusted multiple truck/loader team production: 1,131.82 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 795.18 Hours <br /> <br />Unit cost: <br /> <br />$1.857 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$1,671,040