My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-26_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2017-01-26_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2017 10:29:10 AM
Creation date
1/26/2017 10:06:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
1/26/2017
Doc Name
Midterm Review & Findings & Cost Estimate
From
DRMS
To
Blue Moutain Energy, Inc
Type & Sequence
MT7
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Deserado Mine <br />BULLDOZER WORK <br />Regrade Water Storage Areas and Access Road <br />Permit Action: 2017 Midterm Review Permit/Job#: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado <br />Date: 1/11/2017 County: Rio Blanco <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/flour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Abbreviation: None <br />Filename: C018-003 <br />$97.48 <br />Utilization % <br />NA <br />$103.60 <br />100 <br />$10.74 <br />NA <br />$6.60 <br />100 <br />$38.89 <br />NA <br />$257.31 <br />$1,029.24 <br />MATERIAL OUANTITIES <br />Initial Volume: 4,750 <br />Swell factor: 1.111 <br />Loose volume: 5,277 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Division of Reclamation, Mining & Safety <br />Permit Volume IV <br />Operator Study <br />150 feet <br />910.5 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />5% <br />5,300 feet <br />743 lbs/LCY <br />Weight description: User Provided <br />Job Condition Correction Factor <br />Source <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.