Laserfiche WebLink
Operator Skill: <br />0.900 <br />Material consistency: <br />0.900 <br />Dozing method: <br />1.000 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />1.000 <br />Push gradient: <br />1.000 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.838 <br />Blade type: <br />1.000 <br />Net correction: 0.5634 <br />Adjusted unit 307.62 LCY/hr <br />production: <br />Adjusted fleet 1230.48 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.815/LCY <br />Total job time: 145.14 Hours <br />Total job cost: $145,554 <br />,. U1,61, <br />(CAT HB)) <br />(GEN.) <br />(AVG.) <br />(1 SHIFT/DAY) <br />(DOZ-OC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />CIRCES Cost Estimating Software <br />