Laserfiche WebLink
Operator Skill: <br />0.900 <br />Material consistency: <br />1.000 <br />Dozing method: <br />1.000 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.900 <br />Push gradient: <br />0.903 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.838 <br />Blade type: <br />1.000 <br />Net correction: 0.5087 <br />Adjusted unit 463.17 LCY/hr <br />production: <br />Adjusted fleet 1852.68 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.556/LCY <br />Total job time: 2.85 Hours <br />Total job cost: $2,932 <br />I'm J1. U1,61, <br />(CAT HB) <br />(GEN.) <br />(AVG.) <br />(1 SHIFT/DAY) <br />(SSD -FC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />CIRCES Cost Estimating Software <br />