Laserfiche WebLink
Truck Cvcle Time: <br />Truck Exchange Time: 0.70 Minutes <br />Truck Load Time: 1.975 Minutes <br />Truck Maneuver and Dump 1.10 Minutes <br />Time: <br />Adjusted for site altitude: <br />Adjusted for site altitude: <br />Adjusted for site altitude: <br />Page 10 of 20 <br />0.700 <br />Minutes <br />1.975 <br />Minutes <br />1.100 <br />Minutes <br />Truck Travel (Haul & Return) Time: Road Condition: Hard, smooth, stabilized, surfaced, watered, <br />maintained 2.0 <br />14mil Ronne - <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Loading Tool unit <br />(Ft) <br />Production <br />(%) <br />(%) <br />(fpm) <br />Time <br />214.08 <br />LCY/Hour Adjusted for job efficiency: <br />177.69 LCY/Hour <br />Optimal No. of Trucks: <br />mm <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />1 <br />7000.00 <br />0.00 <br />2.00 <br />2.00 <br />3448 <br />2.589 <br />LCY/Hour <br />Haul Time: <br />2.589 <br />minutes <br />Return Route: <br />Fleet size: <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Loading Tool unit <br />(Ft) <br />Production <br />(%) <br />(%) <br />(fpm) <br />Time <br />214.08 <br />LCY/Hour Adjusted for job efficiency: <br />177.69 LCY/Hour <br />Optimal No. of Trucks: <br />min <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />1 <br />7000.00 <br />0.00 <br />2.00 <br />2.00 <br />3569 <br />2.145 <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />Return Time: 2.145 <br />minutes <br />Total Truck Cycle Time: 8.509 <br />minutes <br />Loading Tool unit <br />Production <br />680.97 <br />LCY/Hour Adjusted for job efficiency: <br />565.21 LCY/Hour <br />Truck Unit Production <br />214.08 <br />LCY/Hour Adjusted for job efficiency: <br />177.69 LCY/Hour <br />Optimal No. of Trucks: <br />3 <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 355.37 <br />LCY/Hour <br />Adjusted single truck/loader team production: 355.37 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 355.37 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 2.06 <br />Hours <br />Unit cost: <br />$2.411 <br />/LCY Total job cost: $1,769 <br />CIRCES Cost Estimating Software <br />