My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-28_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2016-12-28_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 1:14:20 PM
Creation date
1/4/2017 12:51:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
12/28/2016
Doc Name
Memo /Cost Estimate
From
Jason Musick
To
Brock Bowles
Type & Sequence
SL18
Email Name
BFB
DIH
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />Truck Capacity: <br />LCY <br />Truck Payload (weight) Basis: <br />46.50 <br />Material weight: <br />3,400 Pounds/LCY <br />Description: <br />User Provided <br />Rated Payload: <br />122,520 Pounds <br />Payload Capacity: <br />36.04 LCY <br />Truck Bed (volume) Basis: <br />Struck Volume: <br />35.00 <br />LCY <br />Heaped Volume: <br />46.50 <br />LCY <br />Average Volume: <br />40.75 <br />LCY <br />Adjusted Volume: <br />36.04 <br />LCY <br />Final Truck Volume Based on Number of Loader Passes: 30.36 <br />Loading Tool Capacity <br />Bucket Size Class: NA <br />Rated Capacity: 9.200 LCY (heaped) <br />Bucket Fill Factor: 0.825 Blasted rock - avg. blasted 75 - 90% 0.825 <br />Adjusted Capacity: 7.590 LCY <br />Job Condition Corrections: Site Altitude (ft.): 5700 feet <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: Truck: <br />LCY <br />4 passes <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, 0.575 <br />maneuver): <br />minutes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Adj: <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: Truck: <br />LCY <br />4 passes <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, 0.575 <br />maneuver): <br />minutes <br />Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />Bank or broken material 0.04 <br />0.040 <br />(Cat HB) <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high or less <br />0.010 <br />(Cat HB) <br />0.01 <br />Truck Ownership: <br />Common ownership of trucks and loaders - <br />-0.040 <br />(Cat HB) <br />0.04 <br />Operation: <br />Inconsistent operation 0.04 <br />0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />Net Cycle Time Adjustment: 0.050 minutes <br />Adjusted Loader Cycle Time: 0.625 minutes <br />Net Load Time per Truck: 1.975 minutes <br />
The URL can be used to link to this page
Your browser does not support the video tag.