My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-28_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2016-12-28_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 1:14:20 PM
Creation date
1/4/2017 12:51:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
12/28/2016
Doc Name
Memo /Cost Estimate
From
Jason Musick
To
Brock Bowles
Type & Sequence
SL18
Email Name
BFB
DIH
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRUCK/LOADER TEAM WORK <br />Task description: Haul BB Road surface material to pit <br />Site: New Horizon Mine Permit Action: SL18 Permit/Job#: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 082 State: Colorado <br />Date: 12/28/2016 County: Montrose <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: Cat 773F <br />-Loader: CAT 988H <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />Abbreviation: None <br />Filename: C008-082 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Sunnort Eauinment Maintenance Eauinment <br />Total work team cost/hour: $856.97 <br />MATERIAL QUANTITIES <br />Initial volume: 489 CCY Swell factor: 1.500 <br />Loose volume: 734 LCY <br />Source of estimated volume: Operator Task l OJ <br />Source of estimated swell factor: Division Estimate <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />NA <br />50 <br />50 <br />Ownership cost/hour: <br />$113.69 <br />$86.92 <br />NA <br />NA <br />$53.53 <br />$26.43 <br />Operating cost/hour: <br />$98.17 <br />$99.00 <br />NA <br />NA <br />$28.36 <br />$20.38 <br />%Utilization -riper: <br />NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$22.10 <br />$38.60 <br />NA <br />NA <br />$35.83 <br />$0.00 <br />Unit Subtotals: <br />$233.96 <br />$224.52 <br />NA <br />NA <br />$117.72 <br />$46.81 <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$692.44 <br />Support: <br />$0.00 <br />Maint: <br />$164.53 <br />Total work team cost/hour: $856.97 <br />MATERIAL QUANTITIES <br />Initial volume: 489 CCY Swell factor: 1.500 <br />Loose volume: 734 LCY <br />Source of estimated volume: Operator Task l OJ <br />Source of estimated swell factor: Division Estimate <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.