My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-28_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2016-12-28_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 1:14:20 PM
Creation date
1/4/2017 12:51:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
12/28/2016
Doc Name
Memo /Cost Estimate
From
Jason Musick
To
Brock Bowles
Type & Sequence
SL18
Email Name
BFB
DIH
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: New Horizon Mine <br />SCRAPER TEAM WORK <br />Haul BB Detour Rd Bench 1 Material -Slash M <br />PROJECT IDENTIFICATION <br />Permit Action: SL18 <br />Page 11 of 20 <br />Permit/Job#: C1981008 <br />Task #: 82B State: Colorado Abbreviation: None <br />Date: 12/28/2016 County: Montrose Filename: C008 -82B <br />User: JDM <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT COSTShift basis: 1 per day <br />-Scraper: Cat 631G <br />-Dozer: Cat D9T - 9SU <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />Cost Breakdown: Scraper Work Team Support Eauipment Maintenance Eauimnent <br />Total work team cost/hour: $1,719.23 <br />MATERIAL OUANTITIES <br />Initial volume: 6,789 CCY Swell factor: 1.060 <br />Loose volume: 7,196 LCY <br />Source of estimated volume: Operator Task l OK <br />Source of estimated swell factor: Cat Handbook <br />h[I 1119 ala 9 till 111oy Y eW <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />NA <br />50 <br />50 <br />Ownership cost/hour: <br />$104.50 <br />$97.48 <br />NA <br />NA <br />$53.53 <br />$26.43 <br />Operating cost/hour: <br />$129.95 <br />$103.60 <br />NA <br />NA <br />$28.36 <br />$20.38 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$34.24 <br />$38.89 <br />NA <br />NA <br />$35.83 <br />$0.00 <br />Unit Subtotals: <br />$268.69 <br />$239.97 <br />NA <br />NA <br />$117.72 <br />$46.81 <br />Number of Units: <br />4 <br />2 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,554.70 <br />Support: <br />$0.00 <br />Maint: <br />$164.53 <br />Total work team cost/hour: $1,719.23 <br />MATERIAL OUANTITIES <br />Initial volume: 6,789 CCY Swell factor: 1.060 <br />Loose volume: 7,196 LCY <br />Source of estimated volume: Operator Task l OK <br />Source of estimated swell factor: Cat Handbook <br />h[I 1119 ala 9 till 111oy Y eW <br />Material weight: <br />2,900 lbs/LCY <br />Material description: <br />User Provided <br />Rated Payload: <br />81,600 pounds <br />Payload Capacity: <br />28.14 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />28.14 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.