My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (38)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:56:27 AM
Creation date
12/22/2016 8:21:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - Weekly Reports
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINE <br />NEWMONT MINING CO. <br />SQUAW GULCH VLF WEEKLY REPORT <br />Soil Liner Fill: <br />Processing began at Dump 1 location. <br />Underground Workings: <br />Blasting: <br />None. <br />Confirmatory Drilling: <br />UG #6477: Sandvik 700 –37.0 hours,4000LF. Further remediation required. <br />UG #6617: A Cat doxer prepared drill access. Sandvik 700 –3.0 hours,300LF. Further <br />remediation required. <br />Remediation: <br />UG #6679: A John Deere excavator removed shot rock in preparation for geogrid <br />subgrade. A John Deere excavator placed structural backfill to geogrid subgrade.A Cat <br />vibratory roller compacted the fill area.Further remediation required. <br />UG #6692: A Cat excavator continued excavation of possible shaft/adit. Adit extending <br />north/south. Southern portion remediated to competent rock. Northern portion <br />prepared for drill access. Further remediation required. T&M = 17.0 hours. <br />UG #6691:A Cat excavator began excavation of possible stope. Drill access was <br />provided. Further remediation required. T&M = 6.5 hours. <br />UG #6531: A Cat dozer placed structural backfill to design subgrade. A Cat vibratory <br />roller compacted the fill area. Further remediation required. <br />UG #6693: A Cat excavator excavated 10+/-feet to competent rock. Remediated. <br />T&M = 1.5 hours. <br />UG #6484: A Cat excavator excavated 2+/-feet to competent rock. Remediated. <br />T&M = 0.5 hours. <br />UG #6485: A Cat excavator excavated 4+/-feet to competent rock. Remediated. <br />T&M = 1.0 hours. <br />UG #6486: A Cat excavator excavated 5+/-feet to competent rock. Remediated. <br />T&M = 1.0 hours. <br />UG #6455/6456: A Cat excavator and a Cat dozer removed shot rock in preparation for <br />geogrid subgrade. A Cat dozer placed structural backfill to design subgrade. A Cat <br />vibratory roller compacted the fill area. Further remediation required. <br />Underdrain System: <br />Primary Underdrain:Complete. <br />Secondary Underdrain:None. <br />Tertiary Underdrain:None.
The URL can be used to link to this page
Your browser does not support the video tag.