Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINE <br />NEWMONT MINING CO. <br />SQUAW GULCH VLF WEEKLY REPORT <br />Leak Detection: <br />A Cat excavator prepared leak detection trench between stations I18+00 and I26+00. A Cat <br />skidsteer assisted with construction of approximately 650 LF of leak detection per project plans <br />and specifications. <br />Geomembrane: <br />Physical inventory of geomembrane and HVSCS piping onsite. <br />Miscellaneous: <br />MSHA inspection. <br />II)Storm Water Management <br />Best Management Practices (BMPs)continued to be performed.