Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01400‐2.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />August 25, 2016  <br />  <br />  <br />  <br />Page 8  <br />6.3.1. Geomembrane  <br />During geomembrane installation, the CQA Monitor shall observe and document deployment,  <br />trial seams, field seaming, non‐destructive and destructive seam testing, and repairs to assure  <br />that the installation is in compliance with the SPECIFICATIONS.  <br />Deployment ‐ The CQA Monitor shall verify that only approved materials are used, each panel is  <br />given a unique panel number, no geomembrane is placed during unsuitable weather conditions  <br />as outlined in Section 02776, Article 1.05 of the SPECIFICATIONS, the geomembrane is not  <br />damaged  during  installation,  and  anchoring  is  performed  in  compliance  with  the  <br />SPECIFICATIONS and design DRAWINGS. The CQA Monitor shall record the deployment  on the  <br />deployment log form.  <br />Trial  Seams  ‐  The  CQA  Monitor  shall  verify  that  seaming  conditions  are  performed  in  <br />compliance with SPECIFICATIONS, tests are performed at required  intervals,  specified  test  <br />procedures are followed, and retests are performed in compliance with the SPECIFICATIONS. If  <br />the ambient air temperature measured by the CQA Monitor is above 35°F for the entire day,  <br />the INSTALLER shall perform trial seams at the beginning of each crew shift, and immediately  <br />following any  work stoppage (i.e., for lunch, weather conditions, etc.) of for more than 30  <br />minutes or at the  discretion of the CERTIFYING ENGINEER, for each seaming apparatus used  <br />that day. If the ambient air temperature measured by the CQA Monitor is below 35°F for the  <br />entire day, the INSTALLER shall perform four (4) trial seams, at approximately the same time  <br />interval throughout  the scheduled work day. Each Seamer shall make at least one trial seam  <br />each day. Seaming operation shall not commence until the CQA Monitor has determined that  <br />the seaming process is meeting the SPECIFICATION requirement and is acceptable. The CQA  <br />Monitor shall record the trial weld results on the trial seam log form.  <br />Field Seaming ‐ The CQA Monitor shall verify that only approved equipment and personnel  <br />perform  welding,  all  welding  is  performed  under  suitable  conditions  as  specified  in  the  <br />project SPECIFICATIONS, specified overlaps are achieved, seams are oriented in compliance to  <br />project requirements, and that grinding techniques and extrudate meet project requirements  <br />for  extrusion welding.  The CQA Monitor shall record all field seaming on field seaming log  <br />forms.  <br />Non‐Destructive Seam Continuity Testing ‐ The CQA Monitor shall verify that all seams and  <br />repair are non‐destructively tested in compliance with the project SPECIFICATIONS. If a seam  <br />cannot  be  tested,  the  seam  shall  be  capped.  The  CQA  Monitor  shall  observe  capping  <br />operations. The  CQA  Monitor  shall  verify  that  test  equipment  and  gauges  are  functioning  <br />properly and that test procedures are in compliance with the project SPECIFICATIONS.  The  <br />CQA Monitor shall verify that all seams and repairs with failing test results are repaired and/or