My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (40)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (40)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:57:20 AM
Creation date
12/22/2016 8:16:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - Technical Specifications
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01400‐2.DOCX <br />Squaw Gulch VLF <br />Project No.475.0106.006 <br />August 25, 2016 <br /> <br /> <br /> <br />Page 8 <br />6.3.1. Geomembrane <br />During geomembrane installation, the CQA Monitor shall observe and document deployment, <br />trial seams, field seaming, non‐destructive and destructive seam testing, and repairs to assure <br />that the installation is in compliance with the SPECIFICATIONS. <br />Deployment ‐ The CQA Monitor shall verify that only approved materials are used, each panel is <br />given a unique panel number, no geomembrane is placed during unsuitable weather conditions <br />as outlined in Section 02776, Article 1.05 of the SPECIFICATIONS, the geomembrane is not <br />damaged during installation, and anchoring is performed in compliance with the <br />SPECIFICATIONS and design DRAWINGS. The CQA Monitor shall record the deployment on the <br />deployment log form. <br />Trial Seams ‐ The CQA Monitor shall verify that seaming conditions are performed in <br />compliance with SPECIFICATIONS, tests are performed at required intervals, specified test <br />procedures are followed, and retests are performed in compliance with the SPECIFICATIONS. If <br />the ambient air temperature measured by the CQA Monitor is above 35°F for the entire day, <br />the INSTALLER shall perform trial seams at the beginning of each crew shift, and immediately <br />following any work stoppage (i.e., for lunch, weather conditions, etc.) of for more than 30 <br />minutes or at the discretion of the CERTIFYING ENGINEER, for each seaming apparatus used <br />that day. If the ambient air temperature measured by the CQA Monitor is below 35°F for the <br />entire day, the INSTALLER shall perform four (4) trial seams, at approximately the same time <br />interval throughout the scheduled work day. Each Seamer shall make at least one trial seam <br />each day. Seaming operation shall not commence until the CQA Monitor has determined that <br />the seaming process is meeting the SPECIFICATION requirement and is acceptable. The CQA <br />Monitor shall record the trial weld results on the trial seam log form. <br />Field Seaming ‐ The CQA Monitor shall verify that only approved equipment and personnel <br />perform welding, all welding is performed under suitable conditions as specified in the <br />project SPECIFICATIONS, specified overlaps are achieved, seams are oriented in compliance to <br />project requirements, and that grinding techniques and extrudate meet project requirements <br />for extrusion welding. The CQA Monitor shall record all field seaming on field seaming log <br />forms. <br />Non‐Destructive Seam Continuity Testing ‐ The CQA Monitor shall verify that all seams and <br />repair are non‐destructively tested in compliance with the project SPECIFICATIONS. If a seam <br />cannot be tested, the seam shall be capped. The CQA Monitor shall observe capping <br />operations. The CQA Monitor shall verify that test equipment and gauges are functioning <br />properly and that test procedures are in compliance with the project SPECIFICATIONS. The <br />CQA Monitor shall verify that all seams and repairs with failing test results are repaired and/or
The URL can be used to link to this page
Your browser does not support the video tag.