Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01400‐2.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />August 25, 2016  <br />  <br />  <br />  <br />Page 7  <br />sample to a third party geosynthetic laboratory.  As a minimum, the following conformance  <br />tests shall be conducted; with project requirements outlined in Section 02776, Article 2.01:  <br /> Geomembrane:  density (ASTM D1505)  <br />carbon black content (ASTM D1603) thickness (ASTM D5199/D5994)  <br />tensile strength (ASTM D6693)  <br />All  conformance  tests  shall  be  performed  in  compliance  with  the  project  SPECIFICATIONS.  <br />The CQA Monitor shall review the test results and shall report any nonconformance to the  <br />MANAGER, CERTIFYING ENGINEER and the Geosynthetics Installation CONTRACTOR.  <br />6.3. Construction Monitoring And Testing  <br />The CQA Monitor shall monitor and test all geosynthetic components of the construction to  <br />verify  that  the  construction  is  in  compliance  with  the  project SPECIFICATIONS.  The  CQA  <br />Monitor  shall  identify  inadequate  construction  methodologies  or materials which may  <br />adversely  impact  the  performance  of  the facility being constructed and existing structures.  <br />Visual observations throughout the construction  process shall be made to ensure that the  <br />materials are placed to the lines and grades as shown on the DRAWINGS.  <br />The CQA monitor shall review the following submittals by INSTALLER during the project:  <br /> verification that a qualified land surveyor has verified all lines and grades; and  <br /> subgrade  surface  acceptance  certificates for each area to be covered  by  the  lining  <br />system, signed by the INSTALLER.  <br />The CQA Monitor shall:  <br /> Inspect all geosynthetic materials delivered to site. The CQA Monitor shall document any  <br />damage and notify MANAGER;  <br /> obtain geosynthetic packaging identification slips for verification and generation of an on‐ <br />site materials inventory;  <br /> observe  subgrade  conditions  prior  to  geosynthetics  installation and verify that any  <br />deficiencies, as defined in Section 02200 of the SPECIFICATIONS, are corrected;  <br /> observe  permanent  anchoring  of  geosynthetics  to  verify  that  design  and  project  <br />SPECIFICATIONS are met;  observe that required overlap distances are met;  <br /> monitor and record ambient air temperatures;  <br /> verify that no continuous horizontal seams are placed on slopes unless approved by  <br /> CERTIFYING ENGINEER; and  <br /> observe and document that all soil materials placed on top of the geosynthetics are done  <br />in such a manner as to ensure that the geosynthetics are not damaged.