My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (40)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (40)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:57:20 AM
Creation date
12/22/2016 8:16:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - Technical Specifications
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01400‐2.DOCX <br />Squaw Gulch VLF <br />Project No.475.0106.006 <br />August 25, 2016 <br /> <br /> <br /> <br />Page 6 <br /> discuss any problems or potential construction problems. <br /> This meeting will be documented by the CQA Monitor. <br />5.3. Deficiency Meetings <br />Special meetings will be held, as needed, to discuss potential problems or deficiencies. At a <br />minimum, these meetings will be attended by the CQA Monitor and INSTALLER or <br />CONTRACTOR. If the problem relates to a design issue, the MANAGER, DESIGN ENGINEER <br />and CERTIFYING ENGINEER should also be present. The meeting will be documented by the <br />CQA Monitor. <br />6. PART 6: GEOSYNTHETICS CONSTRUCTION QUALITY ASSURANCE <br />Construction of the valley leach facility or specified geosynthetics must be in compliance with <br />the design plans and SPECIFICATIONS. CC&V shall implement a CQA monitoring and testing <br />program to ensure construction compliance by the CONTRACTOR. The quality assurance <br />program shall consist of reviewing CONTRACTOR quality control submittals, material <br />conformance testing, and construction monitoring and testing. <br />The types of geosynthetics used in the valley leach facility construction include polyethylene <br />pipe, geomembrane and geotextile. These geosynthetics are defined in the project <br />SPECIFICATIONS. Prior to and during construction, these geosynthetics shall be sampled and <br />tested to determine if they meet project SPECIFICATIONS. All tests shall be performed in a <br />geosynthetics laboratory approved by the MANAGER and CERTIFYING ENGINEER. <br />6.1. Review Quality Control Submittals <br />Prior to geosynthetic installation, the CQA Monitor shall review the INSTALLER'S quality control <br />submittals to evaluate or confirm that these materials meet project requirements. The CQA <br />Monitor shall review the QC submittals that are outlined in Section 2776 (Geomembrane) and <br />Section 02777 (Geotextile) of the SPECIFICATIONS. <br />6.2. Geomembrane Conformance Testing <br />Prior to geosynthetic installation, the CQA Monitor shall obtain samples of the geomembrane <br />for conformance testing to confirm that these materials meet project requirements. The <br />conformance testing frequency shall be at a rate of 1 test per 150,000 square feet. Samples <br />shall be taken across the entire width of the roll and shall not include the first 3 feet. The <br />samples shall be 3 feet wide by the roll width. The CQA Monitor shall mark the machine <br />direction, roll number on the sample, and date the sample was obtained and forward the
The URL can be used to link to this page
Your browser does not support the video tag.