Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01400‐2.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />August 25, 2016  <br />  <br />  <br />  <br />Page 5  <br />notify  the MANAGER and CERTIFYING ENGINEER who will assist in problem resolution. If the  <br />solution involves a design revision, the DESIGN ENGINEER shall also be contacted.  <br />The corrected deficiency shall be retested and/or approved by the MANAGER and CERTIFYING  <br />ENGINEER before any additional related work is performed by the INSTALLER or CONTRACTOR.  <br />All retests and related documentation shall be recorded by the CQA Monitor and included  <br />in the final Construction Certification Report.  <br />5. PART 5: MEETINGS  <br />This  section  identifies  and  describes  the  meetings  to  be  held  during  the  course  of  the  <br />construction. Meetings  shall  be  held  in  order  to  clearly  define  construction  activities  and  <br />goals in order to facilitate construction.  <br />5.1. Preconstruction Meeting  <br />The MANAGER will hold a preconstruction meeting at the site prior to the start of construction.   <br />The DESIGN  ENGINEER, MANAGER, CERTIFYING  ENGINEER,  CQA  Monitor, INSTALLER,  <br />CONTRACTOR,  and  others  designated  by  the MANAGER  shall  attend  this  meeting.  The  <br />purpose of this meeting will be to:  <br /> review the construction DRAWINGS, CQA Plan, and project SPECIFICATIONS;  <br /> define the responsibilities of each party;  <br /> define lines of communication and authority;  <br /> review method of documentation, testing procedures, and reporting inspection data;    <br /> establish testing protocols and procedures for correcting and documenting  construction  <br />deficiencies;  <br /> discuss any changes that may be needed to ensure that construction will be completed  <br />in compliance with the design; and  <br /> This meeting will be documented by the MANAGER or his designee and copies  distributed  <br />to all parties.  <br />5.2. Progress Meetings  <br />The MANAGER will hold a daily progress meeting, either before the start of work or at the  <br />completion  of work. At  a  minimum,  this  meeting  will  be  attended  by  the  CQA  Monitor,  <br />INSTALLER and CONTRACTOR.  The purpose of this meeting will be to:  <br /> review all the previous day's accomplishments and activities;  <br /> review scheduled work location and activities for the day; and,