Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01400‐2.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />August 25, 2016  <br />  <br />  <br />  <br />Page 9  <br />re‐tested until passing results are achieved. The CQA Monitor shall record all non‐destructive  <br />test locations on the vacuum test and pressure test log forms.    <br />Destructive Seam Testing ‐ The INSTALLER shall obtain samples, at locations selected by the  <br />CQA  Monitor,  of  the  field  seamed  geomembrane  approximately  24  inches  along  and  12  <br />inches across the seam and centered over the seam as follows:  <br /> a minimum of one sample per day;  <br /> a minimum of one sample for each geomembrane seamer;  <br /> a minimum of one sample every 500 feet of seaming; and  <br /> seams that appear suspect to the CQA Monitor.  <br />The CQA Monitor shall witness the testing of destructive seam samples by the INSTALLER. The  <br />INSTALLER shall mark all samples with their roll and seam number, date, machine number,  <br />welding technician identification, extruder and nozzle/wedge temperature, and ambient  air  <br />temperature.  <br />The INSTALLER  shall  test  all  destructive  samples  in  compliance  with  the  project  <br />SPECIFICATIONS.  <br />The INSTALLER shall be responsible for patching all areas cut for test samples in accordance  <br />with  the  SPECIFICATIONS  and MANUFACTURER's  requirements  and  performing  non‐  <br />destructive testing (i.e., vacuum box) of the seams. The CQA Monitor shall record test locations  <br />on the geomembrane defect log forms. Additional testing information will be recorded on  the  <br />geomembrane seam destructive sample log form.  The CQA Monitor shall track failing tests  <br />as described in the SPECIFICATIONS.  <br />Repairs ‐ The CQA Monitor shall observe and document that all repair materials, techniques,  <br />and procedures used for repairs are approved in advance and meet the requirements of the  <br />project  SPECIFICATIONS.  The  CQA  Monitor  shall  verify  that  all  defects  and  repairs  are  <br />marked, recorded,  repaired,  tested,  and  wrinkles  are  addressed,  prior  to  being  covered  by  <br />other materials; and that repairs are performed as specified, including proper patch size or  <br />dimension.  The  CQA Monitor shall record defects and repairs on the defect and repair log  <br />forms.  <br />6.3.2. Geotextile  <br />During  geotextile  installation, the  CQA  Monitor  shall  observe  and  document  deployment,  <br />field  seaming,  and  repairs  to  assure  that  the  installation  is  in  compliance  with  the  <br />SPECIFICATIONS.