Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01400‐2.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />August 25, 2016  <br />  <br />  <br />  <br />Page 3  <br />with  the  DRAWINGS  and  SPECIFICATIONS. MANAGER and CERTIFYING  ENGINEER  will  be  <br />responsible for the resolution of all quality assurance issues.  <br />2.5. Construction Quality Assurance Monitor  <br />The Construction Quality Assurance Monitor, also referred to as the "CQA Monitor", is the  <br />firm  or individual responsible for performing the CQA tasks outlined in this plan. The CQA  <br />Monitor is the official CQA representative of CC&V and has the responsibility of overseeing the  <br />CQA aspects of the project. In this CQA Plan the CQA Monitor is associated with the  <br />CERTIFYING ENGINEER and refers specifically to (To Be Determined).  The CQA Monitor has  <br />the authority to stop any aspect of the work that is not in compliance with the CQA Plan.  <br />Work  would  then  be  resumed  once corrective  action  has been approved by the MANAGER  <br />and CERTIFYING ENGINEER. The specific responsibilities of the CQA Monitor include:  <br /> review the design DRAWINGS, project SPECIFICATIONS, and related  guidance documents;  <br /> review all CONTRACTOR QC submittals and make appropriate recommendations;  <br /> observe geosynthetic material delivery, unloading, and storage;   <br /> obtain and test geosynthetic conformance samples during geosynthetics manufacture;  <br /> observe prepared subgrade prior to geosynthetic deployment;  <br /> monitor  and  document  geosynthetic  material  placement,  trial  seam  testing,  non‐ <br />destructive testing, seaming and repair operations, and destructive testing;  <br /> identify seam samples for CQA destructive testing;  <br /> assure  that  testing  equipment  used,  and  tests  performed  are  conducted  according  to  <br />project SPECIFICATIONS and industry standards;  <br /> perform or observe, document, and report test results to MANAGER as required;  <br /> report any deficiencies to MANAGER that are not corrected to the satisfaction of the CQA  <br />Monitor, including design or project SPECIFICATION changes; and  <br /> prepare  a  Construction  Certification  Report  describing  the  construction,  any  deviations  <br />from  SPECIFICATIONS  or,  DRAWINGS  and  details,  details  of  all  field  and  laboratory  <br />details, subgrade acceptance forms, test data, tests results (both laboratory and field), QC  <br />submittals, geomembrane panel layout as‐built prepared by the CQA Monitor, professional  <br />certification  that  construction  was  completed  in  compliance  with  the  DRAWINGS  and  <br />SPECIFICATIONS.  The  report  will  be  signed  and  sealed  by  the CERTIFYING  ENGINEER  <br />registered in the State of Colorado.  <br />2.6. Geosynthetics Manufacturer  <br />The Geosynthetics Manufacturer, also referred to as the "MANUFACTURER", is responsible for  <br />production  of  the  geosynthetic  components  outlined  in  this  plan.  Each MANUFACTURER