My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (40)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (40)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:57:20 AM
Creation date
12/22/2016 8:16:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - Technical Specifications
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01400‐2.DOCX <br />Squaw Gulch VLF <br />Project No.475.0106.006 <br />August 25, 2016 <br /> <br /> <br /> <br />Page 3 <br />with the DRAWINGS and SPECIFICATIONS. MANAGER and CERTIFYING ENGINEER will be <br />responsible for the resolution of all quality assurance issues. <br />2.5. Construction Quality Assurance Monitor <br />The Construction Quality Assurance Monitor, also referred to as the "CQA Monitor", is the <br />firm or individual responsible for performing the CQA tasks outlined in this plan. The CQA <br />Monitor is the official CQA representative of CC&V and has the responsibility of overseeing the <br />CQA aspects of the project. In this CQA Plan the CQA Monitor is associated with the <br />CERTIFYING ENGINEER and refers specifically to (To Be Determined). The CQA Monitor has <br />the authority to stop any aspect of the work that is not in compliance with the CQA Plan. <br />Work would then be resumed once corrective action has been approved by the MANAGER <br />and CERTIFYING ENGINEER. The specific responsibilities of the CQA Monitor include: <br /> review the design DRAWINGS, project SPECIFICATIONS, and related guidance documents; <br /> review all CONTRACTOR QC submittals and make appropriate recommendations; <br /> observe geosynthetic material delivery, unloading, and storage; <br /> obtain and test geosynthetic conformance samples during geosynthetics manufacture; <br /> observe prepared subgrade prior to geosynthetic deployment; <br /> monitor and document geosynthetic material placement, trial seam testing, non‐ <br />destructive testing, seaming and repair operations, and destructive testing; <br /> identify seam samples for CQA destructive testing; <br /> assure that testing equipment used, and tests performed are conducted according to <br />project SPECIFICATIONS and industry standards; <br /> perform or observe, document, and report test results to MANAGER as required; <br /> report any deficiencies to MANAGER that are not corrected to the satisfaction of the CQA <br />Monitor, including design or project SPECIFICATION changes; and <br /> prepare a Construction Certification Report describing the construction, any deviations <br />from SPECIFICATIONS or, DRAWINGS and details, details of all field and laboratory <br />details, subgrade acceptance forms, test data, tests results (both laboratory and field), QC <br />submittals, geomembrane panel layout as‐built prepared by the CQA Monitor, professional <br />certification that construction was completed in compliance with the DRAWINGS and <br />SPECIFICATIONS. The report will be signed and sealed by the CERTIFYING ENGINEER <br />registered in the State of Colorado. <br />2.6. Geosynthetics Manufacturer <br />The Geosynthetics Manufacturer, also referred to as the "MANUFACTURER", is responsible for <br />production of the geosynthetic components outlined in this plan. Each MANUFACTURER
The URL can be used to link to this page
Your browser does not support the video tag.