Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01400.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />August 25, 2016  <br />  <br />  <br />  <br />Page 7  <br />6.2.2. Placement Of Materials  <br />During  placement  of  Structural  Fill,  Select  Structural  Fill,  Coarse Shaft Backfill, Cemented  <br />Rockfill, Underdrain Fill, Low Volume Solution Collection Fill, Bedding Fill, Leak Detection Fill,  <br />Soil Liner Fill, Drain Cover Fill, Fine Shaft Backfill, Pipe Bedding Material and Granular Filter  <br />Material, the CQA Monitor shall:  <br /> verify the use of appropriate fills;  <br /> monitor  and  document  material  placement,  including  soil  type,  particle  size,  loose  lift  <br />thickness,  moisture  conditioning  process,  compaction  equipment and  methods  used  to  <br />attain  compaction,  including  number  of  passes,  uniformity  of  compaction  coverage,  <br />compacted lift thickness, bonding of lifts and in‐place moisture content and dry density is in  <br />compliance with the SPECIFICATIONS;  <br /> monitor Soil Liner Fill surface preparation to verify that the surface has been proof‐rolled,  <br />compacted,  or  hand  worked  so  as  to  be  in  a  condition  suitable  for  geomembrane  <br />installation as discussed in Section 02200 of the SPECIFICATIONS;  <br /> monitor Bedding Fill placement and surface preparation to verify that the surface is suitable  <br />for geomembrane installation as discussed in Section 02200 of the SPECIFICATIONS;  <br /> monitor the placement of fill to ensure that CONTRACTOR exercises care in the vicinity of  <br />pipes and that the underlying geosynthetics are not damaged;  <br /> monitor and document CONTRACTOR verification of in‐place Soil Liner Fill, Bedding Fill, Low  <br />Volume Solution Collection Fill and Drain Cover Fill thickness;  <br /> monitor equipment being used to place Low Volume Solution Collection  Fill  and Drain  <br />Cover  Fill  to  verify  that  the CONTRACTOR places the material in accordance with the  <br />SPECIFICATIONS;  <br /> monitor that Low Volume Solution Collection Fill and Drain Cover Fill is pushed uphill for  <br />areas in which the slope exceeds 4H:1V and that the dozer does not perform unacceptable  <br />pivot turns; and  <br /> monitor the fill temperature as identified in Section 02200 of the SPECIFICATIONS.  <br />7. PART 7: DOCUMENTATION  <br />Documentation kept by the CQA Monitor shall consist of daily record‐keeping, construction  <br />problem resolutions, design and SPECIFICATION changes, photographic records of construction,  <br />weekly progress reports, chain of custody forms for test sample tracking, and a Construction  <br />Certification Report.