My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (40)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (40)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:57:20 AM
Creation date
12/22/2016 8:16:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - Technical Specifications
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01400.DOCX <br />Squaw Gulch VLF <br />Project No.475.0106.006 <br />August 25, 2016 <br /> <br /> <br /> <br />Page 7 <br />6.2.2. Placement Of Materials <br />During placement of Structural Fill, Select Structural Fill, Coarse Shaft Backfill, Cemented <br />Rockfill, Underdrain Fill, Low Volume Solution Collection Fill, Bedding Fill, Leak Detection Fill, <br />Soil Liner Fill, Drain Cover Fill, Fine Shaft Backfill, Pipe Bedding Material and Granular Filter <br />Material, the CQA Monitor shall: <br /> verify the use of appropriate fills; <br /> monitor and document material placement, including soil type, particle size, loose lift <br />thickness, moisture conditioning process, compaction equipment and methods used to <br />attain compaction, including number of passes, uniformity of compaction coverage, <br />compacted lift thickness, bonding of lifts and in‐place moisture content and dry density is in <br />compliance with the SPECIFICATIONS; <br /> monitor Soil Liner Fill surface preparation to verify that the surface has been proof‐rolled, <br />compacted, or hand worked so as to be in a condition suitable for geomembrane <br />installation as discussed in Section 02200 of the SPECIFICATIONS; <br /> monitor Bedding Fill placement and surface preparation to verify that the surface is suitable <br />for geomembrane installation as discussed in Section 02200 of the SPECIFICATIONS; <br /> monitor the placement of fill to ensure that CONTRACTOR exercises care in the vicinity of <br />pipes and that the underlying geosynthetics are not damaged; <br /> monitor and document CONTRACTOR verification of in‐place Soil Liner Fill, Bedding Fill, Low <br />Volume Solution Collection Fill and Drain Cover Fill thickness; <br /> monitor equipment being used to place Low Volume Solution Collection Fill and Drain <br />Cover Fill to verify that the CONTRACTOR places the material in accordance with the <br />SPECIFICATIONS; <br /> monitor that Low Volume Solution Collection Fill and Drain Cover Fill is pushed uphill for <br />areas in which the slope exceeds 4H:1V and that the dozer does not perform unacceptable <br />pivot turns; and <br /> monitor the fill temperature as identified in Section 02200 of the SPECIFICATIONS. <br />7. PART 7: DOCUMENTATION <br />Documentation kept by the CQA Monitor shall consist of daily record‐keeping, construction <br />problem resolutions, design and SPECIFICATION changes, photographic records of construction, <br />weekly progress reports, chain of custody forms for test sample tracking, and a Construction <br />Certification Report.
The URL can be used to link to this page
Your browser does not support the video tag.