Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01400.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />August 25, 2016  <br />  <br />  <br />  <br />Page 6  <br />6.1. Construction Testing  <br />During construction, the CQA Monitor shall test all earthwork components to verify that the  <br />construction is in accordance with the SPECIFICATIONS. Testing shall be performed on all soil  <br />used in the construction to confirm the materials meet SPECIFICATIONS. The CQA Monitor shall  <br />conduct testing after final placement of the materials. The tests to be performed, and the  <br />testing frequency, for each material type are listed in Tables 1 and 2. The testing frequencies  <br />specified  in  Tables  1  and  2  shall  be  increased  when  the  CQA  Monitor  determines  that  <br />construction conditions (such as adverse weather, equipment breakdown, improperly ballasted  <br />compactor, excessive lift thickness, improper soil type, improper moisture conditioning and  <br />compaction) warrant additional tests.  Additional tests will be approved by MANAGER and  <br />directed by the CQA Monitor.  <br />6.2. Construction Monitoring  <br />The CQA Monitor will monitor and test all earthwork quality assurance components of the  <br />construction to verify that the construction is in accordance with the SPECIFICATIONS. The CQA  <br />Monitor shall identify inadequate construction methodologies or materials that may adversely  <br />impact  the  performance  of  the  facility  being  constructed  and  existing  structures.  The  CQA  <br />Monitor will record visual observations throughout the construction process to ensure that the  <br />materials are placed to the minimum dimensions as shown on the DRAWINGS.  Quality control  <br />testing will be performed by the CONTRACTOR.  <br />6.2.1. Foundation Preparation  <br />The CQA Monitor shall observe and document the foundation preparation including:  <br /> stripping and excavation activities to ensure that CONTRACTOR places the material in the  <br />appropriate stockpile (Structural Fill, Select Structural Fill, Underdrain Fill, Leak Detection  <br />Fill, Low Volume Solution Collection Fill, Bedding Fill, Soil Liner Fill, Drain Cover  Fill, Fine  <br />Shaft Backfill, Pipe Bedding Material and Granular Filter Material), if stockpiling is necessary;  <br /> stockpiling activities to verify location of stockpile, material type, and dressing;  <br /> excavations for moisture seeps, unsuitable foundation soil, elevation, and proper drainage;  <br /> subgrade preparation to confirm that the surface of the subgrade is free of soft, organic,  <br />and  otherwise  deleterious  materials  (such  as  debris,  branches, vegetation,  mud,  ice,  or  <br />frozen  materials);  and  that  soil  and  rock  surfaces  that  contain joints or fractures are  <br />adequately filled in accordance with the SPECIFICATIONS; and   <br /> construction  of  access  roads,  drainage  control  features  and  erosion  control  features  to  <br />verify compliance with the DRAWINGS and SPECIFICATIONS.