My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (40)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (40)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:57:20 AM
Creation date
12/22/2016 8:16:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - Technical Specifications
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01400.DOCX <br />Squaw Gulch VLF <br />Project No.475.0106.006 <br />August 25, 2016 <br /> <br /> <br /> <br />Page 5 <br /> review method of documentation, testing procedures, and reporting inspection data; <br /> establish testing protocols and procedures for correcting and documenting construction <br />deficiencies; <br /> discuss any changes that may be needed to ensure that construction will be completed in <br />compliance with the design; and <br /> This meeting will be documented by MANAGER and copies will be distributed to all parties. <br />5.2. Progress Meetings <br />MANAGER will hold a daily progress meeting, either before the start of work or at the <br />completion of work. At a minimum, this meeting will be attended by the CQA Monitor and <br />CONTRACTOR. The purpose of this meeting will be to: <br /> review all the previous day's accomplishments and activities; <br /> review scheduled work location and activities for the day; <br /> discuss any problems or potential construction problems; and, <br /> review test data. <br />5.3. Deficiency Meetings <br />Special meetings will be held, as needed, to discuss potential problems or deficiencies. At a <br />minimum, these meetings will be attended by the CQA Monitor and CONTRACTOR. If the <br />problem relates to a design issue, MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER <br />should also be present. The meeting will be documented by the CQA Monitor. <br />6. PART 6: EARTHWORKS CONSTRUCTION QUALITY ASSURANCE <br />Construction of the valley leach facility or specified earthworks shall be in accordance with the <br />DRAWINGS and SPECIFICATIONS. A CQA monitoring and testing program shall be implemented <br />by CC&V to ensure construction compliance by the CONTRACTOR. The CQA testing program <br />shall consist of construction testing of materials used in the valley leach facility construction. <br />The types of materials are defined in the SPECIFICATIONS. During construction, the CQA <br />Monitor shall sample and test these soil types to determine if they meet SPECIFICATIONS. The <br />CQA Monitor shall obtain and test soil samples in accordance with American Society for Testing <br />and Material standards ASTM D75 and ASTM D420. All tests shall be performed by the CQA <br />Monitor on‐site or in a geotechnical laboratory approved by the CERTIFYING ENGINEER.
The URL can be used to link to this page
Your browser does not support the video tag.