Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01400.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />August 25, 2016  <br />  <br />  <br />  <br />Page 8  <br />7.1. Daily Record Keeping  <br />Daily records kept by the CQA Monitor shall consist of field notes, observation and testing data  <br />sheets,  summary  of  the  daily  meeting  with CONTRACTOR,  and  reporting  of  construction  <br />problems and resolutions. The CQA Monitor shall submit this information on a regular basis to  <br />MANAGER for review.    <br />7.2. Soils Observation and Testing Forms  <br />The  CQA  Monitor  will  document  soils  observations  on  forms  that generally  include  the  <br />following information:  <br /> date, project name, location, and weather data, including high and low daily temperatures;  <br /> a site plan showing work areas and test locations;  <br /> descriptions  of  ongoing  construction  detailing  work  areas  and  equipment  utilized  by  <br />CONTRACTOR;  <br /> summary of test results and samples obtained, with locations and elevations;  <br /> resolutions of deficient test results;  <br /> test equipment calibrations, if necessary;  <br /> summary of meetings held; and  <br /> signature or initials of the CQA Monitor.  <br />7.3. Photo Documentation  <br />The CQA Monitor shall photograph all phases of construction. Photographs shall be identified  <br />by location, time, date, and name of the CQA Monitor taking the photograph.  <br />7.4. Design and Specification Changes  <br />During construction, the need to address DESIGN and SPECIFICATION changes, modifications, or  <br />clarifications may arise. In such cases the CQA Monitor shall notify MANAGER, which shall  <br />notify the DESIGN ENGINEER and the CERTIFYING ENGINEER.   DESIGN and SPECIFICATION  <br />changes shall only be made with written agreement from MANAGER and DESIGN ENGINEER.  <br />7.5. Weekly Progress Reports  <br />The  CQA  Monitor  shall  prepare  weekly  progress  reports  summarizing  all  construction  and  <br />quality assurance activities.  This report shall be submitted to MANAGER and shall include the  <br />following information:  <br /> date, project name, and location;