|
Table 12
<br />Cripple Creek & Victor Gold Mining Company
<br />Squaw Gulch Valley Leach Facility
<br />Phase 1 Completion
<br />Soil Liner Fill Depth Verification Summary
<br />NORTHING EASTING
<br />LOCATION
<br />PASS/FAILREQUIRED
<br />DEPTH (IN)DATE SAMPLE NUMBER
<br />DEPTH
<br />(IN)
<br />ELEVATION
<br />(FT)
<br />07/05/16 NFSLF‐31‐D 14 56,216.3 37,012.0 FG 12 PASS
<br />07/08/16 NFSLF‐32‐D 15 55,950.1 36,875.3 FG 12 PASS
<br />07/11/16 NFSLF‐33‐D 15 55,904.3 36,824.9 FG 12 PASS
<br />07/11/16 NFSLF‐34‐D 14 55,950.4 36,687.9 FG 12 PASS
<br />07/12/16 NFSLF‐35‐D 15 55,723.8 36,622.7 FG 12 PASS
<br />07/12/16 NFSLF‐36‐D 12 55,727.8 36,514.8 FG 12 PASS
<br />07/13/16 NFSLF‐37‐D 15 55,692.6 36,539.8 FG 12 PASS
<br />07/14/16 NFSLF‐38‐D 15 55,521.3 36,426.7 FG 12 PASS
<br />07/15/16 NFSLF‐39‐D 15 56,679.0 36,678.1 FG 12 PASS
<br />07/15/16 NFSLF‐40‐D 14 56,647.9 36,499.4 FG 12 PASS
<br />07/15/16 NFSLF‐41‐D 13.5 56,685.6 36,355.5 FG 12 PASS
<br />07/18/16 NFSLF‐42‐D 12 56,697.2 36,699.4 FG 12 PASS
<br />07/18/16 NFSLF‐43‐D 13 56,629.4 36,791.7 FG 12 PASS
<br />07/19/16 NFSLF‐44‐D 12 56,681.3 37,107.3 FG 12 PASS
<br />07/19/16 NFSLF‐45‐D 15 56,657.7 37,061.6 FG 12 PASS
<br />07/19/16 NFLSF‐46‐D 12 56,567.7 36,892.8 FG 12 PASS
<br />07/20/16 NFSLF‐47‐D 12 56,604.4 37,218.2 FG 12 PASS
<br />07/20/16 NFSLF‐48‐D 14 56,509.3 37,259.0 FG 12 PASS
<br />07/20/16 NFSLF‐49‐D 13.5 56,565.3 37,309.7 FG 12 PASS
<br />07/20/16 NFSLF‐50‐D 15 56,506.6 37,333.5 FG 12 PASS
<br />07/21/16 NFSLF‐51‐D 15 56,450.3 37,511.5 FG 12 PASS
<br />7/22/216 NFSLF‐52‐D 15 56,373.8 37,525.5 FG 12 PASS
<br />07/22/16 NFSLF‐53‐D 15 56,371.0 37,604.0 FG 12 PASS
<br />07/25/16 NFSLF‐54‐D 13 55,413.5 36,435.4 FG 12 PASS
<br />07/25/16 NFSLF‐55‐D 15 55,335.4 36,342.7 FG 12 PASS
<br />07/26/16 NFSLF‐56‐D 13 55,207.5 36,426.1 FG 12 PASS
<br />07/26/16 NFSLF‐57‐D 13 55,174.0 36,377.4 FG 12 PASS
<br />07/27/16 NFSLF‐58‐D 13 55,113.2 36,328.9 FG 12 PASS
<br />07/27/16 NFSLF‐59‐D 14 55,202.9 36,244.6 FG 12 PASS
<br />07/27/16 NFSLF‐60‐D 15 56,350.8 37,569.0 FG 12 PASS
<br />07/27/16 NFSLF‐61‐D 13 56,322.1 37,433.6 FG 12 PASS
<br />07/27/16 NFSLF‐62‐D 15 54,955.9 36,169.7 FG 12 PASS
<br />07/28/16 NFSLF‐63‐D 15 56,211.7 37,459.2 FG 12 PASS
<br />07/29/16 NFSLF‐64‐D 15 56,072.7 37,371.3 FG 12 PASS
<br />08/01/16 NFSLF‐65‐D 14 54,891.3 36,262.4 FG 12 PASS
<br />08/01/16 NFSLF‐66‐D 15 54,735.9 36,263.6 FG 12 PASS
<br />08/03/16 NFSLF‐67‐D 14 56,043.9 37,395.0 FG 12 PASS
<br />08/04/16 NFSLF‐68‐D 15 55,922.7 37,225.1 FG 12 PASS
<br />08/09/16 NFSLF‐69‐D 14 56,555.4 37,575.8 FG 12 PASS
<br />Page 3 of 4
|