Laserfiche WebLink
Table 12 <br />Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch Valley Leach Facility <br />Phase 1 Completion <br />Soil Liner Fill Depth Verification Summary <br />NORTHING EASTING <br />LOCATION <br />PASS/FAILREQUIRED  <br />DEPTH (IN)DATE SAMPLE NUMBER <br />DEPTH  <br />(IN) <br />ELEVATION  <br />(FT) <br />08/23/15 D323 13 56,465.39 35,598.09 9,696.42 12 PASS <br />08/24/15 D324 13 56,458.25 35,692.58 9,715.11 12 PASS <br />08/25/15 D325 14 56,430.24 35,807.62 9,723.16 12 PASS <br />08/26/15 D326 14 56,272.38 35,931.84 9,655.35 12 PASS <br />08/27/15 D327 13 56,377.25 36,606.40 9,741.37 12 PASS <br />08/28/15 D328 14 56,292.77 36,587.92 9,702.78 12 PASS <br />08/29/15 D329 15 56,389.83 36,484.19 9,733.67 12 PASS <br />08/30/15 D330 15 56,285.78 36,125.40 9,666.34 12 PASS <br />08/31/15 D331 15 56,382.59 36,178.30 9,713.28 12 PASS <br />06/04/16 NFSLF‐1‐D 15 56,319.1 36,344.9 FG 12 PASS <br />06/04/16 NFSLF‐2‐D 14 56,293.5 36,416.6 FG 12 PASS <br />06/08/16 NFSLF‐3‐D 15 57,630.5 35,127.0 FG 12 PASS <br />06/09/16 NFSLD‐4‐D 13 57,440.2 35,152.0 FG 12 PASS <br />06/10/16 NFSLF‐5‐D 12 57,286.2 35,176.4 FG 12 PASS <br />06/10/16 NFSLF‐6‐D 14 57,179.7 35,277.2 FG 12 PASS <br />06/11/16 NFSLF‐7‐D 13.5 57,049.8 35,315.3 FG 12 PASS <br />06/11/16 NFSLF‐8‐D 12 56,887.8 35,335.6 FG 12 PASS <br />06/11/16 NFSLF‐9‐D 14 56,868.1 35,443.8 FG 12 PASS <br />06/14/16 NFSLF‐10‐D 13.5 56,796.5 35,545.0 FG 12 PASS <br />06/15/16 NFSLF‐11‐D 13 56,696.7 35,708.1 FG 12 PASS <br />06/15/16 NFSLF‐12‐D 14 56,622.1 35,760.7 FG 12 PASS <br />06/15/16 NFSLF‐13‐D 13 56,514.5 35,754.9 FG 12 PASS <br />06/15/16 NFSLF‐14‐D 13.5 56,588.6 35,874.3 FG 12 PASS <br />06/16/16 NFSLF‐15‐D 12 56,464.4 35,946.4 FG 12 PASS <br />06/16/16 NFSLF‐16‐D 13 56,626.3 36,083.9 FG 12 PASS <br />06/17/16 NFSLF‐17‐D 12 56,644.1 36,110.0 FG 12 PASS <br />06/17/16 NFSLF‐18‐D 13 56,518.4 36,218.5 FG 12 PASS <br />06/17/16 NFSLF‐19‐D 12 56,662.4 36,367.8 FG 12 PASS <br />06/20/16 NFSLF‐20‐D 13 56,487.6 36,391.8 FG 12 PASS <br />06/20/16 NFSLF‐21‐D 12 56,606.5 36,491.3 FG 12 PASS <br />06/21/16 NFSLF‐22‐D 14 56,634.0 36,541.5 FG 12 PASS <br />06/22/16 NFSLF‐23‐D 12 56,577.3 36,685.7 FG 12 PASS <br />06/22/16 NFSLF‐24‐D 15 56,577.3 36,685.7 FG 12 PASS <br />06/23/16 NFSLF‐25‐D 15 56,466.8 36,878.1 FG 12 PASS <br />06/28/16 NFSLF‐26‐D 12 56,511.2 37,021.2 FG 12 PASS <br />06/28/16 NFSLF‐27‐D 15 56,363.2 37,066.7 FG 12 PASS <br />06/28/16 NFSLF‐28‐D 12 56,259.6 37,023.8 FG 12 PASS <br />07/05/16 NFSLF‐29‐D 15 55,947.1 36,950.2 FG 12 PASS <br />07/05/16 NFSLF‐30‐D 12 56,049.5 37,033.1 FG 12 PASS <br />Page 2 of 4