Table 12
<br />Cripple Creek & Victor Gold Mining Company
<br />Squaw Gulch Valley Leach Facility
<br />Phase 1 Completion
<br />Soil Liner Fill Depth Verification Summary
<br />NORTHING EASTING
<br />LOCATION
<br />PASS/FAILREQUIRED
<br />DEPTH (IN)DATE SAMPLE NUMBER
<br />DEPTH
<br />(IN)
<br />ELEVATION
<br />(FT)
<br />08/09/16 NFSLF‐70‐D 15 56,578.3 37,483.0 FG 12 PASS
<br />08/11/16 NFSLF‐71‐D 14 55,731.5 37,069.0 FG 12 PASS
<br />08/11/16 NFSLF‐72‐D 15 55,830.8 37,090.7 FG 12 PASS
<br />08/12/16 NFSLF‐73‐D 12 56,444.6 37,702.6 FG 12 PASS
<br />08/12/16 NFSLF‐74‐D 13 56,374.2 37,638.9 FG 12 PASS
<br />08/16/16 NFSLF‐75‐D 13 56,232.3 37,699.4 FG 12 PASS
<br />08/16/16 NFSLF‐76‐D 15 56,300.6 37,662.0 FG 12 PASS
<br />08/16/16 NFSLF‐77‐D 14 55,722.5 36,851.7 FG 12 PASS
<br />08/18/16 NFSLF‐78‐D 14 56,177.0 37,668.4 FG 12 PASS
<br />08/22/16 NFSLF‐79‐D 15 55,982.3 37,611.2 FG 12 PASS
<br />08/22/16 NFSLF‐80‐D 14 55,954.0 37,499.4 FG 12 PASS
<br />08/26/16 NFSLF‐81‐D 15 55,270.2 36,531.0 FG 12 PASS
<br />08/26/16 NFSLF‐82‐D 15 55,316.4 36,551.6 FG 12 PASS
<br />09/06/16 NFSLF‐83‐D 15 55,691.3 37,295.5 FG 12 PASS
<br />09/06/16 NFSLF‐84‐D 15 55,814.9 37,467.6 FG 12 PASS
<br />09/06/16 NFSLF‐85‐D 15 55,733.2 37,249.5 FG 12 PASS
<br />09/08/16 NFSLF‐86‐D 12 54,771.7 36,413.1 FG 12 PASS
<br />09/08/16 NFSLF‐87‐D 15 55,045.9 36,402.9 FG 12 PASS
<br />09/10/16 NFSLF‐88‐D 15 55,713.5 36,949.0 FG 12 PASS
<br />09/10/16 NFSLF‐89‐D 15 55,119.7 36,516.2 FG 12 PASS
<br />09/10/16 NFSLF‐90‐D 13 54,708.6 36,430.8 FG 12 PASS
<br />Notes:
<br />1. Only testing performed within the limits of the Phase 1 Completion area are presented in this table. For a
<br />complete list of testing performed by Amec, refer to the reports "Squaw Gulch VLF Phase 1 (9,450' to 9,550'
<br />Bench) and "Squaw Gulch VLF Phase 1 (9,550‐foot Bench to Completed Areas Outlined on Figure 2)"
<br />submitted by Amec in October 2015 and January 2016, respectively.
<br />Page 4 of 4
|