Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company  <br />Squaw Gulch VLF Phase 1 Completion  <br />Record of Construction Report  <br />475.0106.006  <br />October 14, 2016  <br />  <br />P:\Projects\0106.006 CC&V CQA and EDS\J‐REPORTS\ROC Report\475.0106.006 CCV PHASE 1 ROC REPORT ‐ FINAL161014.DOCX  <br />   Page 2  <br />1.2. Parties Involved  <br />Work performed during the Squaw Gulch VLF Phase 1 Completion project was completed by  <br />several parties.  Responsible parties involved in the project are listed below:  <br /> Project management was provided by CC&V. Messrs. Ron Roberts, Ron DiDonato and  <br />Jeff  Gaul  represented  CC&V  as  the  Construction  Manager  and  Construction  <br />Superintendents, respectively.  <br /> Ames Construction Inc. (Ames) was contracted by CC&V as the general  contractor  <br />responsible for all construction activities.   <br /> EC Applications, Inc. (ECA) was subcontracted by Ames to perform the geomembrane  <br />installation.   <br /> NewFields provided field engineering and construction QA/QC testing and inspection  <br />starting on March 1, 2016. A Staff Schedule of NewFields Personnel is presented in  <br />Appendix A.1.  <br /> Amec provided field engineering and construction QA/QC testing and inspection from  <br />the start of Phase 1 construction until February 29, 2016. A Staff Schedule of Amec  <br />Personnel is presented in Appendix A.2.  <br /> Agru America Inc. (Agru) manufactured and delivered all geosynthetic materials.  <br /> Texas Research International, Inc. (TRI) was subcontracted by NewFields and Amec to  <br />perform third party conformance testing during the geosynthetics manufacturing.  <br />1.3. Construction Quality Assurance (CQA) / Construction Quality Control (CQC)  <br />The CQA and CQC monitoring and testing was provided by Amec from January 2013 through  <br />February  2016.  In  March  2016,  CC&V  contracted  NewFields  to  perform  all  CQA  and  CQC  <br />activities for the remainder of the Squaw Gulch VLF project. This report was developed by  <br />NewFields, but includes documentation of construction activities that were overseen by Amec.  <br />All CQA records of testing are presented in the Tables and Appendices attached to this report.  <br />Any documentation collected prior to March 1, 2016 was done so by Amec and reviewed by  <br />NewFields. NewFields documented all of the CQA observations and testing after February 29,  <br />2016. The term “CQA Monitor” within this report applies to both NewFields and Amec for the  <br />time periods explained above.  <br />1.4. Design Drawings and Technical Specifications  <br />The Phase 1 Squaw Gulch VLF was constructed in general accordance with the Design Drawings  <br />and  Technical  Specifications  from  the  report  titled  “Cripple  Creek  &  Victor  Gold  Mining  <br />Company, Squaw Gulch Valley Leach Facility Design,” issued by Amec, September 1, 2011. The  <br />IFC Drawings and Record of Construction (ROC) Drawings are attached to this document. Survey