My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (31)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (31)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:52:55 AM
Creation date
12/22/2016 8:15:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - 0 Completion Report
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch VLF Phase 1 Completion <br />Record of Construction Report <br />475.0106.006 <br />October 14, 2016 <br /> <br />P:\Projects\0106.006 CC&V CQA and EDS\J‐REPORTS\ROC Report\475.0106.006 CCV PHASE 1 ROC REPORT ‐ FINAL161014.DOCX <br /> Page 2 <br />1.2. Parties Involved <br />Work performed during the Squaw Gulch VLF Phase 1 Completion project was completed by <br />several parties. Responsible parties involved in the project are listed below: <br /> Project management was provided by CC&V. Messrs. Ron Roberts, Ron DiDonato and <br />Jeff Gaul represented CC&V as the Construction Manager and Construction <br />Superintendents, respectively. <br /> Ames Construction Inc. (Ames) was contracted by CC&V as the general contractor <br />responsible for all construction activities. <br /> EC Applications, Inc. (ECA) was subcontracted by Ames to perform the geomembrane <br />installation. <br /> NewFields provided field engineering and construction QA/QC testing and inspection <br />starting on March 1, 2016. A Staff Schedule of NewFields Personnel is presented in <br />Appendix A.1. <br /> Amec provided field engineering and construction QA/QC testing and inspection from <br />the start of Phase 1 construction until February 29, 2016. A Staff Schedule of Amec <br />Personnel is presented in Appendix A.2. <br /> Agru America Inc. (Agru) manufactured and delivered all geosynthetic materials. <br /> Texas Research International, Inc. (TRI) was subcontracted by NewFields and Amec to <br />perform third party conformance testing during the geosynthetics manufacturing. <br />1.3. Construction Quality Assurance (CQA) / Construction Quality Control (CQC) <br />The CQA and CQC monitoring and testing was provided by Amec from January 2013 through <br />February 2016. In March 2016, CC&V contracted NewFields to perform all CQA and CQC <br />activities for the remainder of the Squaw Gulch VLF project. This report was developed by <br />NewFields, but includes documentation of construction activities that were overseen by Amec. <br />All CQA records of testing are presented in the Tables and Appendices attached to this report. <br />Any documentation collected prior to March 1, 2016 was done so by Amec and reviewed by <br />NewFields. NewFields documented all of the CQA observations and testing after February 29, <br />2016. The term “CQA Monitor” within this report applies to both NewFields and Amec for the <br />time periods explained above. <br />1.4. Design Drawings and Technical Specifications <br />The Phase 1 Squaw Gulch VLF was constructed in general accordance with the Design Drawings <br />and Technical Specifications from the report titled “Cripple Creek & Victor Gold Mining <br />Company, Squaw Gulch Valley Leach Facility Design,” issued by Amec, September 1, 2011. The <br />IFC Drawings and Record of Construction (ROC) Drawings are attached to this document. Survey
The URL can be used to link to this page
Your browser does not support the video tag.