Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company  <br />Squaw Gulch VLF Phase 1 Completion  <br />Record of Construction Report  <br />475.0106.006  <br />October 14, 2016  <br />  <br />P:\Projects\0106.006 CC&V CQA and EDS\J‐REPORTS\ROC Report\475.0106.006 CCV PHASE 1 ROC REPORT ‐ FINAL161014.DOCX  <br />   Page 3  <br />for the Squaw Gulch VLF Phase 1 Completion ROC drawings was performed by Ames. A copy of  <br />the Surveyor’s Professional License is presented in Appendix B. The Technical Specifications are  <br />presented in Appendix C and the earthwork material specifications are summarized in Table 1.  <br />Any deviations from the IFC drawings or project technical specifications are discussed in Section  <br />4 of this report.  <br />1.5. Use of this Report  <br />This report has been prepared exclusively for the Cripple Creek & Victor Gold Mining Company.   <br />No third party, other than NewFields, shall be entitled to rely on any information, conclusions,  <br />opinions or other information contained herein without the express written consent of CC&V.  <br />2. SQUAW GULCH VLF CONSTRUCTION ACTIVITIES  <br />Ames  performed  all  construction  activities  during  the  Squaw  Gulch  VLF  project,  excluding  <br />geomembrane installation. Equipment used to perform these activities is listed below:  <br /> CAT 14 Motor‐grader  <br /> CAT D6 Low Ground Pressure (LGP)  <br />Dozer  <br /> CAT  D6  LGP  Dozers  equipped  with  <br />Global Positioning System (GPS)  <br /> CAT D7 LGP Dozer  <br /> CAT D8 Dozer  <br /> CAT D10 Dozer  <br /> John Deere 950 Dozer  <br /> CAD 289 Skidsteer  <br /> Bobcat Skidsteer  <br /> CAT 928 Loader  <br /> CAT 980 Loader  <br /> CAT 988 Loader  <br /> CAT 992 Loader  <br /> CAT 993 Loader  <br /> Komatsu WA470 Loader  <br /> CAT CS56 Smooth Drum Compactor  <br /> CAT 308 Excavator  <br /> CAT 312 Excavator  <br /> CAT 330 Excavator  <br /> CAT336 Excavator w/ Roller  <br />Attachment  <br /> CAT 345 Excavator  <br /> John Deere 35 Excavator  <br /> John Deere 850 Excavator  <br /> CAT 740 Haul Trucks  <br /> CAT 777 Haul Trucks  <br /> Tandem Axle Water Trucks  <br /> CAT 773 Water Wagon  <br />2.1. Clearing and Grubbing  <br />The footprint of the Phase 1 Squaw Gulch VLF was stripped of all deleterious materials. Any soil  <br />containing vegetation was removed and placed in several site topsoil stockpiles designated by