Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company  <br />Squaw Gulch VLF Phase 1 Completion  <br />Record of Construction Report  <br />475.0106.006  <br />October 14, 2016  <br />  <br />P:\Projects\0106.006 CC&V CQA and EDS\J‐REPORTS\ROC Report\475.0106.006 CCV PHASE 1 ROC REPORT ‐ FINAL161014.DOCX  <br />   Page 1  <br />1. INTRODUCTION   <br />NewFields Mining Design and Technical Services (NewFields) was commissioned by the Cripple  <br />Creek  &  Victor  Gold  Mining  Company  (CC&V),  which  is  owned  and  managed  by  Newmont  <br />Mining Corporation, to provide Construction Quality Assurance and Quality Control (QA/QC) for  <br />the construction of the Squaw Gulch Valley Leach Facility (VLF) Phase 1 Completion. The project  <br />is located in Teller County, Colorado, just east of the city of Cripple Creek. The Squaw Gulch VLF  <br />is included in the Cresson Project, which is a gold mining and ore processing facility comprised  <br />of surface mines, crushers, lined VLFs, gold recovery plants, and associated infrastructure. The  <br />Cresson project was designed and constructed to meet or exceed the requirements established  <br />by C.R.S. §34 32 101 et seq. and regulations promulgated there under by the Mined Land  <br />Reclamation Board (MLRB). The work associated with the Cresson Project is being performed  <br />under specific criteria established in Amendment No. 10 of Permit Number M‐1980‐244, as  <br />approved by the MLRB.   <br />This  report  documents  the  Construction  Quality  Assurance  (CQA) and  Construction  Quality  <br />Control (CQC) services for the Squaw Gulch VLF Phase 1 Completion, and is a continuation of  <br />the “Squaw Gulch VLF Phase 1 (9,550‐foot Elevation Bench to Completed Areas Outlined on  <br />Figure 2,” submitted January 2016 by Amec Foster Wheeler (Amec). The attached Figures 1 and  <br />2 present the general site location and the Squaw Gulch VLF Phase 1 Completion certification  <br />limits, respectively.   <br />1.1. Project Description  <br />The Squaw Gulch VLF is located north of the current Arequa VLF in an area referred to as Squaw  <br />Gulch, and is referred to as the Squaw Gulch VLF as part of the Mine Life Extension 2 Project.  <br />This area encompasses Squaw, Anaconda, and Swede Gulches. The Squaw Gulch VLF Phase 1  <br />Completion area is a continuation of construction, and includes the addition of approximately  <br />63  acres  required  to  complete  the  Squaw  Gulch  VLF  Phase  1  construction.  Construction  <br />associated with this certification report was completed in October 2016.  <br />The Squaw Gulch VLF Phase 1 Completion area was constructed by placing Soil Liner Fill (SLF),  <br />overlain  with  an  80  mil  Linear  Low  Density  Polyethylene  (LLDPE)  double  sided  micro‐spike  <br />(DSMS) geomembrane, and covered with Drain Cover Fill (DCF).  The Phase 1 grading plan and  <br />typical  VLF  cross  sections  are  shown  on  Drawings  A200  and  A220/A230  in  the  Issued  for  <br />Construction (IFC) drawing set, respectively.    <br />