Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company  <br />Squaw Gulch VLF Phase 1 Completion  <br />Record of Construction Report  <br />475.0106.006  <br />October 14, 2016  <br />  <br />P:\Projects\0106.006 CC&V CQA and EDS\J‐REPORTS\ROC Report\475.0106.006 CCV PHASE 1 ROC REPORT ‐ FINAL161014.DOCX  <br />     <br />Appendix K.2   80mil LLDPE DSMS Geomembrane Conformance Testing  <br />Appendix K.3   100mil LLDPE Smooth Geomembrane Conformance Testing  <br />Appendix K.4   100mil LLDPE SSMS Geomembrane Conformance Testing  <br />Appendix K.5   Geomembrane Exposed Longer than 180 days Conformance  <br />Testing  <br /> Appendix L  Tensiometer Certifications  <br /> Appendix M  Solution Collection Piping Modifications Memorandum   <br /> Appendix N  Structural Fill Monitoring for Phase 1 Squaw Gulch Valley Leach Facility  <br /> Appendix O  DCF Acceptance  <br />Appendix O.1  Amec DCF Acceptance Figures  <br />Appendix O.2  Leak Location Services Report  <br />  <br />  <br />  <br />  <br />  <br />