Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company  <br />Squaw Gulch VLF Phase 1 Completion  <br />Record of Construction Report  <br />475.0106.006  <br />October 14, 2016  <br />  <br />P:\Projects\0106.006 CC&V CQA and EDS\J‐REPORTS\ROC Report\475.0106.006 CCV PHASE 1 ROC REPORT ‐ FINAL161014.DOCX  <br />     <br /> A400  HIGH VOLUME SOLUTION COLLECTION PIPING LAYOUT  <br /> A410  HIGH VOLUME SOLUTION COLLECTION SYSTEM DETAILS  <br />*Only drawings relevant to Squaw Gulch VLF Phase 1 Construction have been included. Refer to  <br />the “Squaw  Gulch  Valley  Leach  Facility Design”  report  submitted  by  AMEC  Earth  and  <br />Environmental on September 1, 2011 for the complete drawing set.  <br />RECORD OF CONSTRUCTION DRAWINGS  <br /> RECORD DRAWING NO. 1 OF 6  GENERAL COMPOSITE OVERVIEW  <br /> RECORD DRAWING NO. 2 OF 6  TOP OF SOIL LINER FILL AS‐BUILT  <br /> RECORD DRAWING NO. 3 OF 6  UNDERDRAIN AS‐BUILT  <br /> RECORD DRAWING NO. 4 OF 6  HIGH VOLUME SOLUTION COLLECTON SYSTEM  <br />       AS‐BUILT    <br /> RECORD DRAWING NO. 5 OF 6  LEAK DETECTION TRENCH AS‐BUILT  <br /> RECORD DRAWING NO. 6 OF 6  GEOMEMBRANE PANEL LAYOUT AS‐BUILT  <br />LIST OF TABLES  <br /> Table 1    Summary of Earthworks Material Specifications  <br /> Table 2    Earthworks Testing Summary and Frequency  <br /> Table 3    Summary of Weather Data  <br /> Table 4    Fill Temperature Monitoring Summary  <br /> Table 5    CQA Earthworks Testing Summary – Underdrain Fill  <br /> Table 6    CQA Earthworks Testing Summary – Select Structural Fill  <br /> Table 7    CQA Earthworks Testing Summary – Structural Fill  <br /> Table 8    CQA Earthworks Testing Summary – Leak Detection Fill  <br /> Table 9    CQA Earthworks Testing Summary – Soil Liner Fill  <br /> Table 10    CQA Earthworks Testing Summary – Drain Cover Fill  <br /> Table 11    Nuclear Gauge Moisture‐Density Testing Summary – Soil Liner Fill  <br /> Table 12    Soil Liner Fill Depth Verification Summary  <br />