Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company  <br />Squaw Gulch VLF Phase 1 Completion  <br />Record of Construction Report  <br />475.0106.006  <br />October 14, 2016  <br />  <br />P:\Projects\0106.006 CC&V CQA and EDS\J‐REPORTS\ROC Report\475.0106.006 CCV PHASE 1 ROC REPORT ‐ FINAL161014.DOCX  <br />     <br />LIST OF FIGURES  <br /> Figure 1    Site Location  <br /> Figure 2    Certification and Geomembrane Installation Limits  <br /> Figure 3    Destructive Sample Test Codes for Dual Hot Wedge Fusion Welds  <br /> Figure 4    Destructive Sample Test Codes for Extrusion Welds with Leister Heat          <br />                Seams   <br />LIST OF APPENDICES  <br /> Appendix A   Staff Schedule for CQA Monitor Personnel  <br />Appendix A.1  Staff Schedule for NewFields Personnel  <br />Appendix A.2  Staff Schedule for Amec Personnel  <br /> Appendix B  Surveyor’s Professional License  <br /> Appendix C   Technical Specifications  <br /> Appendix D   Structural Fill Method Specifications  <br /> Appendix E  Soil Liner Fill Acceptance Forms  <br /> Appendix F   Weekly Reports  <br /> Appendix G   Photographic Documentation  <br />Appendix G.1  Photograph Log  <br />Appendix G.2  Construction Photographs  <br /> Appendix H   Laboratory Test Results  <br />Appendix H.1  Underdrain Fill Laboratory Test Results  <br />Appendix H.2  Select Structural Fill Laboratory Test Results  <br />Appendix H.3  Structural Fill Laboratory Test Results  <br />Appendix H.4  Leak Detection Fill Laboratory Test Results  <br />Appendix H.5  Soil Liner Fill Laboratory Test Results  <br />Appendix H.6  Drain Cover Fill Laboratory Test Results  <br /> Appendix I  Geosynthetics Quality Control Documents and Inventory  <br />Appendix I.1  Geomembrane Inventory Control  <br />Appendix I.1.1   40mil LLDPE Smooth Geomembrane Inventory Control  <br />Appendix I.1.2   80mil LLDPE DSMS Geomembrane Inventory Control