Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company  <br />Squaw Gulch VLF Phase 1 Completion  <br />Record of Construction Report  <br />475.0106.006  <br />October 14, 2016  <br />  <br />P:\Projects\0106.006 CC&V CQA and EDS\J‐REPORTS\ROC Report\475.0106.006 CCV PHASE 1 ROC REPORT ‐ FINAL161014.DOCX  <br />     <br />3.4.3. Geomembrane Fusion Seaming ....................................................................... 14  <br />3.4.4. Geomembrane Extrusion Seaming ................................................................... 14  <br />3.4.5. Geomembrane Destructive Testing .................................................................. 14  <br />3.4.6. Geomembrane Pressure Testing ...................................................................... 15  <br />3.4.7. Geomembrane Defects and Repairs ................................................................. 15  <br />3.4.8. Geomembrane Acceptance .............................................................................. 16  <br />4. PROJECT DEVIATIONS ............................................................................................................ 16  <br />5. ENGINEER’S OPINION ............................................................................................................ 17  <br />  <br />  <br />ISSUED FOR CONSTRUCTION DRAWINGS*  <br /> A000  VLF TITLE SHEET  <br /> A20  EXISTING SITE CONDITIONS  <br /> A25  GEOTECHNICAL INVESTIGATION  <br /> A40  SITE GEOLOGY MAP   <br /> A80  SOIL LINER FILL BORROW AREA SHEET 1 OF 2   <br /> A82  SOIL LINER FILL BORROW ISOPACH  <br /> A85  SOIL LINER FILL BORROW AREA SHEET 2 OF 2  <br /> A200  PHASE 1 SQUAW GULCH GRADING PLAN  <br /> A201  PHASE 1 SQUAW GULCH GRADING PLAN ISOPACH  <br /> A202  PHASE 1 GRADING ALIGNMENT PLAN VIEW  <br /> A203  PHASE 1 GRADING HORIZONTAL ALIGNMENT DATA  <br /> A215  OVERALL LINER LIMITS  <br /> A220  VALLEY LEACH FACILITY SECTIONS AND DETAILS SHEET 1 OF 2  <br /> A230  VALLEY LEACH FACILITY SECTIONS AND DETAILS SHEET 2 OF 2  <br /> A240  HAUL ROAD PLAN AND PROFILE SHEET 1 OF 4  <br /> A241  HAUL ROAD PLAN AND PROFILE SHEET 2 OF 4  <br /> A242  HAUL ROAD PLAN AND PROFILE SHEET 3 OF 4  <br /> A243  HAUL ROAD PLAN AND PROFILE SHEET 4 OF 4  <br /> A244  SOUTH PERIMETER ROAD PLAN AND PROFILE  <br /> A245  WEST PERIMETER ROAD PHASE 1 PLAN AND PROFILE  <br /> A250  UNDERDRAIN DETAILS SHEET 1 OF 2  <br /> A260  LEAK DETECTION AND TYPICAL EROSION CONTROL DETAILS