Laserfiche WebLink
Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.900 <br />(AB.AVG.) <br />Material consistency: <br />1.100 <br />(CAT HB) <br />Dozing method: <br />1.000 <br />GEN. <br />Visibility: <br />1.000 <br />AVG. <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />1.000 <br />(DOZ-OC) <br />Push gradient: <br />1.225 <br />(CAT HB) <br />Altitude: <br />0.930 <br />(CAT HB) <br />Material Weight: <br />0.894 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.8369 <br />Adjusted unit production: 933.65 LCY/hr <br />Adjusted fleet production: 3734.6 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.511/LCY <br />Total job time: 154.02 Hours <br />Total job cost: $293,744.12 <br />CIRCES Cost Estimating Software <br />