Laserfiche WebLink
BULLDOZER WORK <br />Task description: Doze Remaining East Pit Spoil <br />Site: Colowyo Coal Mine Permit Action: Permit Renewal 06 Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 005 State: Colorado <br />Date: 3/18/2013 County: Moffat <br />10:43:33 AM <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D l l R- 11 U <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />1 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: CO 19-005 <br />Total unit Cost/Hour: $476.80 <br />Total Fleet Cost/Hour: $1,907.19 <br />MATERIAL QUANTITIES <br />Utilization % <br />Ownership Cost/Hour: <br />$143.02 <br />NA <br />Operating Cost/Hour: <br />$280.92 <br />100 <br />Ripper op. Cost/Hour: <br />$15.45 <br />100 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $476.80 <br />Total Fleet Cost/Hour: $1,907.19 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />575,200 <br />Swell factor: <br />1.000 <br />Loose volume: <br />575,200 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />285 feet <br />1,115.6 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />-10% <br />7,600 feet <br />2,572 lbs/LCY <br />User Provided <br />CIRCES Cost Estimating Software <br />