Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br />Task description: Load and Haul Spoil to Final East Pit <br />Site: Colowyo Coal Mine Permit Action: Permit Renewal 06 <br />PROJECT IDENTIFICATION <br />Task #: 006 State: Colorado <br />Date: 3/18/2013 County: Moffat <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: KOMATSU 830E <br />-Loader: LETOURNEAU L2350 <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance -Motor Grader: <br />-Water Truck: <br />Cost Breakdown: Truck/Loader Team <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: CO 19-006 <br />Shift basis: 1 per day <br />CatDllR- 11U <br />CatDIIR- 11U <br />CAT 16M <br />Water Tanker, 14,000 Gal. <br />Sunnnrt Roninment <br />Maintenance F.rniinment <br />Total work team cost/hour: $3,883.24 <br />MATERIAL OUANTITIES <br />Initial volume: 731,475 CCY Swell factor: 1.000 <br />Loose volume: 731,475 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Cametty <br />Truck Payload (weight) Basis: <br />Material weight: 2,572 Pounds/LCY <br />Description: User Provided <br />Rated Payload: 492,200 Pounds <br />Payload Capacity: 191.37 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />100 <br />100 <br />50 <br />50 <br />Ownership cost/hour: <br />$113.41 <br />$344.51 <br />$126.54 <br />$126.54 <br />$63.07 <br />$64.31 <br />Operating cost/hour: <br />$307.64 <br />$531.88 <br />$280.92 <br />$280.92 <br />$45.18 <br />$73.13 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$25.66 <br />$35.82 <br />$37.41 <br />$37.41 <br />$27.55 <br />$21.17 <br />Unit Subtotals: <br />$446.72 <br />$912.20 <br />$444.88 <br />$444.88 <br />$135.79 <br />$158.61 <br />Number of Units: <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$2,699.08 <br />Support: <br />$889.76 <br />Maint: <br />$294.40 <br />Total work team cost/hour: $3,883.24 <br />MATERIAL OUANTITIES <br />Initial volume: 731,475 CCY Swell factor: 1.000 <br />Loose volume: 731,475 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Cametty <br />Truck Payload (weight) Basis: <br />Material weight: 2,572 Pounds/LCY <br />Description: User Provided <br />Rated Payload: 492,200 Pounds <br />Payload Capacity: 191.37 LCY <br />CIRCES Cost Estimating Software <br />