Laserfiche WebLink
Storm Water Management Plan (SWMP), September 2012 <br />GCC Energy – King Coal & King II Mines <br />5 <br /> <br />SECTION 3: POTENTIAL POLLUTANT SOURCES <br />3.1 Industrial Activity and Appropriate Best Management Practices <br />Industrial <br />Activity Best Management Practices <br />Access & <br />Haul Roads <br /> Roads treated and watered as necessary to minimize dust generation <br /> Roads sloped toward drainage ditches and sediment traps <br /> Drainage ditches directed to sediment/settling pond <br />Parking <br />Areas <br /> Drainage directed to ditches draining to sediment/settling pond <br /> Good housekeeping practices <br />Reclamation <br />Activities <br /> Drainage directed to ditches draining to sediment/settling pond <br /> Disturbed areas to be revegetated <br /> <br /> <br />King II Mine <br />Mine <br />Drainage <br />Area <br />Industrial <br />Activity Best Management Practices <br />A, B, C, <br />D <br />Access & <br />Haul Roads <br /> Roads treated and watered as necessary to minimize dust <br />generation <br /> Roads sloped toward drainage ditches and sediment traps <br /> Cattleguard minimizes vehicle track-out at site exit <br />A, D <br />Fueling <br />Area, Gas/ <br />Diesel/ Oil <br />Storage <br /> Stored in covered building with concrete floor and curb <br /> Fueling area constructed on concrete pad with rolled curb <br /> Fueling area secondary containment overfill flows into <br />catchment pond <br /> Spill prevention and management procedures in place <br />A, D Soil <br />Stockpiles <br /> Vegetated for stabilization <br /> Berms installed for sediment control <br />B, C <br />Loading/ <br />Unloading <br />Operations <br /> Drainage ditches directed to sediment/settling pond <br /> Dust minimized through equipment controls and <br />procedures <br />B, D Maintenance <br />Areas <br /> Covered buildings <br /> Exterior areas constructed on concrete pad with rolled <br />curb and drain to oil/water separator <br /> Good housekeeping practices <br />B, D Material <br />Storage <br /> Materials stored indoors whenever possible <br /> Drainage directed to ditches draining to sediment/settling <br />pond <br /> <br /> <br /> <br />