Laserfiche WebLink
Storm Water Management Plan (SWMP), September 2012 <br />GCC Energy – King Coal & King II Mines <br />6 <br /> <br /> <br />King II Mine (continued) <br />Mine <br />Drainage <br />Area <br />Industrial <br />Activity Best Management Practices <br />B, D Parking <br />Areas <br /> Drainage directed to ditches draining to sediment/settling <br />pond <br /> Good housekeeping practices <br />C <br />Crushing/ <br />Transport <br />Operations <br /> Enclosed conveyor belts <br /> Dust shields placed over windows in coal silos <br /> Drainage ditches directed to sediment/settling pond <br />C Coal <br />Stockpiles <br /> Perimeter berms installed for sediment control <br /> Drainage ditches directed to sediment/settling pond <br /> <br /> <br />Details and descriptions of each Best Management Practice (BMP), and facility-wide <br />BMPs are located in Section 4. <br />3.2 Non-Storm Water Discharges Documentation <br /> Date of evaluation: January 25, 2012 <br /> Description of the evaluation criteria used: The site was visually examined for <br />signs of non-storm water impact (e.g., odor, color, oil sheen, solids, etc.). <br />Results indicate that no non-storm water discharges are occurring. <br /> List of the outfalls or onsite drainage points that were directly observed during the <br />evaluation: Sediment pond outlets, sediment traps