Laserfiche WebLink
Storm Water Management Plan (SWMP), September 2012 <br />GCC Energy – King Coal & King II Mines <br />7 <br /> <br /> <br />SECTION 4: STORM WATER QUALITY CONTROLS <br />4.1 SWMP Administrator(s) <br />SWMP Administrator <br />Tom Bird Office: (970) 385-4528 x 6503 <br />Manager of Coal Services Cell: (970) 769-1160 <br />GCC Energy, LLC <br /> <br />SWMP Alternate Administrator(s) <br />Wade Wymore Office: (970) 385-4528 x 6507 <br />Manager of Surface Operations <br />GCC Energy, LLC <br /> <br />Additional Contacts <br />Barbara T. Hodgson Office: (719) 647-6829 <br />Environmental Manager Cell: (720) 231-0364 <br />bhodgson@gcc.com <br /> <br />One or all of the personnel listed above may be responsible for assisting the <br />mine operator in the implementation, maintenance and revision of the SWMP. <br /> <br />In addition, relevant employees receive an overview of the SWMP elements upon <br />hiring and on an annual basis. The SWMP Administrator is responsible to <br />ensure that the required inspections and effluent monitoring occur, training is <br />provided, and that the records for inspections are maintained. <br />4.2 Preventive Maintenance <br />The GCC King Coal and King II Mines employ a preventive maintenance <br />program, which includes regular inspections of commonly-used areas. In <br />addition, comprehensive inspections are conducted bi-annually, and are <br />described in Section 5. <br /> <br />Preventive maintenance involves the regular inspection of equipment and <br />vehicles used and stored at the facility. These inspections should uncover <br />conditions such as cracks or slow leaks which could cause breakdowns or <br />failures that result in discharges of chemicals to surface waters. The purpose of <br />the preventive maintenance program is to prevent breakdowns and failures by <br />adjustment, repair, or replacement of equipment before a major breakdown or <br />failure can occur. <br /> <br />Maintenance activities associated with vehicles and mine equipment include the <br />following: <br />