Laserfiche WebLink
Storm Water Management Plan (SWMP), September 2012 <br />GCC Energy – King Coal & King II Mines <br />4 <br /> <br />A temporary soil stockpile is located in the northeast corner of the facility, within Area D. <br />The northwest section of the property contains the shop area, which is used for vehicle <br />maintenance, storage, and a wash bay for vehicles. The product transfer building and <br />concrete slab, which houses vehicle fuels and lubricants, is located near the <br />southwestern arm of Area D. The mine portal is also located within Area D. <br /> <br />Clearwater Ditches <br />Two clearwater drainage ditches located at the east and west perimeters of the facility <br />divert uncontaminated stormwater around the facility’s coal processing and industrial <br />areas. The clearwater ditches do not drain into the facility’s sedimentation pond, but <br />join at a point south of the pond. From there, the uncontaminated stormwater is <br />discharged into Hay Gulch. <br /> <br /> <br /> <br />