Laserfiche WebLink
Table 1. Summary of Past Bond Releases at Trapper Mine <br />Submittal <br />Proposed <br />Decision <br />Date(s) <br />Released Area <br />Ph I <br />(acres) <br />Released Area <br />Ph II <br />(acres) <br />Released Area <br />Ph III <br />(acres) <br />Reduction in <br />Liability <br />SL -01 <br />Feb 12, 1998 <br />(Ph I) <br />Dec 14, 1998 <br />Ph I <br />2,511.7 <br />1,548.0 <br />0.0 <br />0.0 <br />$0.00 <br />$0.00 <br />SL -02 <br />23 -Dec -99 <br />0.0 <br />319.5 <br />0.0 <br />$0.00 <br />SL -03 <br />19 -Apr -02 <br />0.0 <br />592.7 <br />0.0 <br />$0.00 <br />SL -04 <br />18 -Nov -03 <br />0.0 <br />0.0 <br />1,857.7 <br />$82,659.00 <br />SL -05 <br />11 -Jun -04 <br />823.9 <br />0.0 <br />0.0 <br />$0.00 <br />SL -06 <br />6 -Sep -05 <br />0.0 <br />819.1 <br />0.0 <br />$2,587,606.00 <br />SL -07 <br />16 -May -06 <br />0.0 <br />0.0 <br />762.8 <br />$371,146.00 <br />SL -08 <br />21 -Nov -08 <br />476.6 <br />0.0 <br />0.0 <br />$0.00 <br />SL -09 <br />2 -Dec -08 <br />0.0 <br />294.6 <br />0.0 <br />$898,333.00 <br />SL -10 <br />17 -Nov -08 <br />0.0 <br />0.0 <br />305.0 <br />$228,664.00 <br />SL -11 <br />7 -Jan -11 <br />57.8 <br />0.0 <br />0.0 <br />$0.00 *1 <br />SL -12 <br />5/14/12 <br />0.0 <br />165.5 <br />0.0 <br />$695,081.66 <br />SL -13 <br />5/14/12 <br />0.0 <br />0.0 <br />364.5 <br />$0.00 <br />SL -14 <br />1/10/2014 <br />417.8 <br />0.0 <br />0.0 <br />$2,068,397.69 <br />SL -15 <br />2/20/2014 <br />120.4 <br />0.0 <br />0.0 <br />$520,670.46 <br />SL -16 <br />1/21/2015 <br />0.0 <br />277.80 <br />0.0 <br />$376,228.82 <br />SL -17 <br />Proposed <br />0.0 <br />0.0 <br />448.4 <br />$696,737.41 <br />*1- No change in liability occurred in SL -11, the liability amount at the time of the approval of SL -11 was updated as a result of Midterm Review 6 <br />(MT6). <br />Trapper Mine Page 3 November, 2016 <br />Phase III Bond Release (SL -17) <br />