My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-29_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2016-11-29_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 12:57:17 PM
Creation date
12/1/2016 12:55:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
11/29/2016
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining, Inc
Permit Index Doc Type
Findings
Email Name
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Submittal of Bond Release Application and Completeness Determination by the Division <br />The Division received TMI's bond release application SL -17 on October 14, 2015. The application was <br />found complete on October 23, 2015, after the Division received proof of publication of the applicant's <br />public notice. The completeness determination was made in accordance with Section 3.03.2(1)(d). <br />TMI submitted the bond release application following the procedures described in the Act and <br />Regulations. The application also utilized the Division's Guideline Regarding Selected Coal Mine Bond <br />Release Issues, dated April 18, 1995. Map 1, entitled "SL -17 Phase III Bond Release Area Delineation" <br />and submitted with the application, shows the location of each parcel. <br />Public Notice <br />TMI published notice of the bond release application in the Craig Daily Press once weekly for four <br />consecutive weeks, beginning on Sept 21, 2015. TMI also notified landowners within and adjacent to the <br />mine permit area, and other interested parties of the application for bond release, as required by section <br />3.03.2(1). The Division received no written comments, objections, or requests for an informal conference <br />regarding the bond release application. <br />Bond Release Inspection <br />The Division conducted a bond release inspection on July 6, 2016. The site inspection was conducted in <br />accordance with Section 3.03.2(2). Attendees included: <br />• Christine Belka, Office of Surface Mining Reclamation and Enforcement (OSMRE) #182 <br />• Charlie Earl, Bureau of Land Management (BLM) <br />• Tabetha Lynch, Colorado Division of Reclamation, Mining, and Safety (DRMS) <br />• Jennifer Maiolo, BLM <br />• Jason Musick, DRMS <br />• Graham Roberts, Trapper Mining, Inc. (TMI) <br />• Jerod Smith, Colorado State Land Board <br />The Division notified the landowners of the inspection via certified mail. <br />Adequacy Review <br />On August 11, 2016, the Division sent adequacy review items along with the SLI 7 bond release inspection <br />reportto TMI. The Division requested that 1.8 acres of parcel A -C-04 be excluded from the SL -17 bond <br />Trapper Mine Page 4 November, 2016 <br />Phase III Bond Release (SL -17) <br />
The URL can be used to link to this page
Your browser does not support the video tag.