My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-29_REVISION - M1977141
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977141
>
2016-11-29_REVISION - M1977141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:13 PM
Creation date
11/30/2016 8:16:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977141
IBM Index Class Name
Revision
Doc Date
11/29/2016
Doc Name
Adequacy Review Response
From
Aggregate Industries
To
DRMS
Type & Sequence
TR2
Email Name
MAC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Response: <br /> Technical Revision No. 2 is revised to include a schedule indicating how and when <br /> reclamation will be implemented and completed for the different phases of <br /> reclamation as shown in Table 1. <br /> Table 1 — Reclamation Schedule <br /> Duratioi-j'Ili <br /> Final Design and Construction Documents 6 months <br /> Procurement of Construction Contractor 2 months <br /> Procurement of Growth Medium Sources 2 months <br /> Mobilization, Site Prep. and Initial Earthwork 1st season <br /> Construction <br /> Soils Analysis and Test Plots for Revegetation Plan 1st season <br /> Mobilization and Final Earthwork Construction 2nd season <br /> Revegetation, Sediment Pond Reclamation, 2nd season <br /> Demobilization <br /> 17. The Reclamation Plan states the berm/ditch alignment will be established as <br /> grading of the Quarry Excavation Area nears completion. Please specify the Best <br /> Management Practices which will be used to restrict sediment transport from the <br /> site during the grading project. <br /> Response: <br /> Technical Revision No. 2 is revised to state that erosion and sedimentation <br /> controls will be established prior to any site grading. The construction documents <br /> for the reclamation will include specifications for Erosion Protection and <br /> Sedimentation Control that require design, installation, maintenance, and removal <br /> of all necessary erosion protection and sediment controls. The specification will <br /> reference Boulder County Storm Drainage Criteria Manual that requires the design <br /> of best management practices (BMPs) be consistent with the guidance in the <br /> Colorado Department of Transportation (CDOT) Erosion Control and Stormwater <br /> Quality Guide (CDOT, 2006) or Urban Drainage and Flood Control District <br /> (UDFCD), Urban Storm Drainage Criteria Manual Volume 3 (UDFCD, 2016). <br /> 18. The Sedimentation and Pond Reclamation section of the Technical Revision <br /> states surface water shall be removed from the area prior to backfill activities. <br /> Does this mean the pond will be dewatered prior to backfilling? If so, specify where <br /> hdrinc.com <br /> 1670 Broadway. Suite 3400. Denver,CO 80202-4824 <br /> (303)764-1520 <br />
The URL can be used to link to this page
Your browser does not support the video tag.