Laserfiche WebLink
Task description: <br />Attachment - 2; Post SL -8 Liability Estimate <br />Cos t Fs timate <br />COST SUMMARY WORK <br />Permit Action: Post SL8 Cost <br />Site: Roadside Portals Estimate Permit/Job#: C1981041 <br />PROJECT IDENTIFICATION <br />Task#: 000 State: Colorado Abbreviation: None <br />Date: 12/3/2015 County: Mesa Filename: C041-000 <br />Us er: JLE <br />Agencyororganizationname: DRMS <br />TASK LIST (DIRECT COSTS) <br />TaskForm <br />Descriptio <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />104 <br />105 <br />107 <br />110 <br />112 <br />121 <br />131 <br />132 <br />181 <br />182 <br />200 <br />201 <br />202 <br />203 <br />204 <br />205 <br />206 <br />Rep lace top soil on North Portal Area (3 acre s o f <br />Area #22) <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />5.20 <br />$1,364.00 <br />$1,432.00 <br />$3,864.00 <br />$983.00 <br />$164.00 <br />$3,883.68 <br />$18,252.00 <br />$14,744.00 <br />$1,245.00 <br />$1,810.00 <br />$28.00 <br />$19.00 <br />$144.00 <br />$524.00 <br />$6,808.50 <br />$5,677.00 <br />$9,777.00 <br />Topsoil,Pile3 to N.PortalArea- Pond 13, Flume, <br />Sub St.G <br />SCRAPER1 <br />2.81 <br />Topsoil 1.2 Acre CRDA 1 Access Road, 2.4 acre <br />Pond 6& 10 <br />SCRAPERI <br />7.58 <br />Replace Topsoil frm Stockpile to CBA -2 and Pond <br />11-1.8 acre <br />SCRAPERI <br />1.93 <br />Replace Topsoil fromStockpile to CBA -1 Sump <br />3 acres <br />SCRAPERI <br />0.32 <br />Plug and Seal Boreholes <br />BOREHOLE <br />0.00 <br />Drill Seed Upland Seed Mixon Mine Site <br />REVEGE <br />19.20 <br />Broadcast Seed U landMixon Steep Areas <br />REVEGE <br />11.20 <br />Respread 18" ofCoveronCRDA#1 <br />DOZER <br />4.75 <br />Drill seed La downAreaonCRDA#1 <br />REVEGE <br />2.00 <br />Spread top soil on.3 acre conveyor cooridor (Area <br />#27) <br />DOZER <br />0.11 <br />Spread topsoil over.2 acres for Substation A (Area <br />#28) <br />DOZER <br />0.07 <br />Spread topsoil over.9 acres (Pond 8 and 9, Area <br />#29) <br />DOZER <br />0.55 <br />Topsoil Light Use Road 1; 1.9 acres ofArea#30 <br />SCRAPERI <br />1.03 <br />D3 Maintenance over Liability Period <br />SITEMAINT <br />ENANCE <br />83.00 <br />Mobilize Equipment for Remaining Reclamation <br />MOBILIZE <br />3.85 <br />Mobilize Equipment for Site Maintenance <br />MOBILIZE <br />12.50 <br />SUBTOTALS: <br />156.1 <br />$70,720 <br />G 1981-041, SL -09 Findings Document Page 20 of 79 <br />