Laserfiche WebLink
*a - For Area #22 (24.1 acres, not including Substation G, Topsoil Pile # 1, the reclaimed portion of <br />the old upper diversion ditch and the reclaimed flume area at the end of the old upper diversion <br />ditch), the SL -08 Findings Document, Attachment # 14, Part 2, indicates that 3.0 acres would still <br />need to obtain Phase II and Phase III bond release within the 24.1 acre parcel. With SL -09, SCC <br />decided to assign .1 acres of this area to the Substation G area (which was .5 acres). This resulted in <br />a decrease in this portion of the Area #22 parcel to 24.0 acres with only 2.9 acres needing to obtain <br />Phase II and III bond release. Given this, the Substation G acreage was increased to .6 acres. With <br />the approval of SL -09, the .6 acres assigned to the Substation G area will be approved for Phase II <br />bond release but will still need to obtain Phase III bond release. <br />C-1981-041, SL -09 Findings Document Page 19 of 79 <br />21 in 2014 ARR) <br />Permanent <br />Haul Roads to CRDA <br />3.4 <br />0.0 <br />0.0 <br />0 <br />Disturbance <br />1, 2, and 3 <br />0.2 acres <br />that were <br />withheld <br />Access Road #2 <br />due to <br />Permanent <br />(through North <br />0.4 <br />0.0 <br />0.0 <br />overlying <br />Disturbance <br />Decline) <br />potentially <br />affected <br />underground <br />workings <br />Permanent <br />Coal Creek <br />0.8 <br />0.0 <br />0.0 <br />0 <br />Disturbance <br />Realignment <br />Permanent <br />Coal Gulch <br />1.4 <br />0.0 <br />0.0 <br />0 <br />Disturbance <br />Realignment <br />Permanent <br />North Portal Upper <br />1.4 <br />0.0 <br />0.0 <br />0 <br />Disturbance <br />Diversion Ditch <br />Permanent <br />Top Soil Pile #2 <br />0.3 <br />0.0 <br />0.0 <br />0 <br />Disturbance <br />(remnant) <br />1.0 acres <br />North Decline Misc. <br />that were <br />(West Diversion Ditch <br />withheld <br />Permanent <br />#1, East Diversion <br />due to <br />Disturbance <br />Ditches # 1 and #2, <br />1.3 <br />0.0 <br />0.0 <br />overlying <br />12" CMP, and 12" v- <br />potentially <br />ditches) <br />affected <br />underground <br />workings <br />Totals <br />241.7 <br />0.2 <br />2.6 <br />14.6 <br />*a - For Area #22 (24.1 acres, not including Substation G, Topsoil Pile # 1, the reclaimed portion of <br />the old upper diversion ditch and the reclaimed flume area at the end of the old upper diversion <br />ditch), the SL -08 Findings Document, Attachment # 14, Part 2, indicates that 3.0 acres would still <br />need to obtain Phase II and Phase III bond release within the 24.1 acre parcel. With SL -09, SCC <br />decided to assign .1 acres of this area to the Substation G area (which was .5 acres). This resulted in <br />a decrease in this portion of the Area #22 parcel to 24.0 acres with only 2.9 acres needing to obtain <br />Phase II and III bond release. Given this, the Substation G acreage was increased to .6 acres. With <br />the approval of SL -09, the .6 acres assigned to the Substation G area will be approved for Phase II <br />bond release but will still need to obtain Phase III bond release. <br />C-1981-041, SL -09 Findings Document Page 19 of 79 <br />