Laserfiche WebLink
INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02 <br />Total= <br />$1,428.54 <br />1.05 <br />Total= <br />$742.56 <br />51.56 <br />Total= <br />$3,875.25 <br />10.00 <br />Total= <br />$7,072.00 <br />TOTALO & P = <br />$13,118.35 <br />CONTRACT AMOUNT (direct +0 & P) = <br />$83,838.35 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legaVrelated costs): 0.00 <br />Engineering work and/or contract/bid preparation: 8.00 <br />Reclamation management and/or administration: 5.81 <br />CONTINGENCY: 3.00 <br />Total= 0.00 <br />Total= $6,707.07 <br />$4,871.01 <br />Total= $2,121.60 <br />TOTALINDIRECT COST= $26,818.03 <br />TOTAL BOND AMOUNT (direct+ indirect) = $97,538.03 <br />C-1981-041, SL -09 Findings Document Page 21 of 79 <br />