Laserfiche WebLink
 Please re-seed the sparse areas of vegetation on the Pond C embankment. <br />o They did seed the embankment. <br /> Please make the necessary repairs and adjustments to the f lume and weir at ponds F and G. <br />o This item has been addressed. <br /> Please cleanout the ditch south of the rail line east of the train loadout and clean out the sediment traps and <br />rock check dams as depicted on Exhib it 49DD -F1 in the permit. <br />o A train was being loaded so we could not see the ditch in question . Brian Watterson and I spoke <br />with the c ontractor who has conducted some maintenance at the site and he said they had cleaned <br />out the ditch and installed three new rock checks. <br />WCR Coreholes: <br /> Please remove the casing at the WC17 corehole and place a marker at the corehole location. <br />o This item was addressed. <br /> Based on previous Division inspections the following coreholes will need to be marked with a marker: <br />WC27, WC29, WC28, WC26F, WC12 and WC04. According to Ms. Blomquist, these coreholes have not <br />been marked. <br />o WC26F is marked, regraded and reseeded. <br />o WC27 is marked, regraded and reseeded. <br />o WC29 is marked, regraded and reseeded. <br />o WC12 is marked and well vegetated. <br />o WC17 is marked and well vegetated. <br />o WC28 is marked, regraded and reseeded. <br />o WC04 was not observed, the Division will check this corehole during the next inspection. <br /> Please locate and mark corehole WC11. <br />o The hole is mar ked and the area is reclaimed with dense grasses and forbs established. It appears <br />the casing is removed. <br />10RT Pipeline <br /> TC will need to place disturbance boundary markers along the pipeline corridor in accordance with Rule <br />4.02.3. <br />o Some markers are in place, however the number and frequency are inadequate and more are <br />needed. <br /> Please install sediment control waddles around the base of the two pipeline connection locations at the east <br />and west end of the 10RT pipeline. <br />o This item was addressed.