My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-31_REVISION - M1980244 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-08-31_REVISION - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2016 3:51:10 PM
Creation date
10/25/2016 1:35:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/31/2016
Doc Name
Specifications - Adequacy Review Response
From
CC&V
To
DRMS
Type & Sequence
TR78
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 02210.DOCX <br />Squaw Gulch VLF <br />Project No.475.0106.006 <br />August 25, 2016 <br /> <br /> <br /> <br />Page 2 <br />2. PART 2: PRODUCTS <br />2.1. Materials <br />A. Fill materials will consist of Structural Fill, Select Structural Fill, and Coarse Shaft Backfill <br />identified in Section 2200.0, Cast‐In‐Place Concrete identified in Section 3300.0 and <br />Cemented Rockfill identified in Section 3310.0. <br />3. PART 3: EXECUTION <br />3.1. Excavation <br />A. The CONTRACTOR will be responsible for the safety of temporary construction slopes. <br />CONTRACTOR shall inspect all temporary and permanent open‐cut excavations on a <br />regular basis for signs of instability. Should signs of instability be noted, CONTRACTOR <br />shall immediately undertake remedial measures and shall notify MANAGER immediately. <br />Permanent cut slopes shall be left in smooth, safe, and stable condition at the end of the <br />workday. <br />B. CONTRACTOR shall conduct all excavation and shoring operations in compliance with <br />applicable Colorado State and Federal government laws and regulations. <br />3.2. Fill Placement <br />A. Structural Fill <br />1. CONTRACTOR shall condition, place and compact Structural Fill by a method <br />compaction technique, as discussed in Section 2200.0. <br />Maximum rock size for rock fill shall be two‐thirds of the compacted lift thickness, <br />unless otherwise approved by MANAGER, DESIGN ENGINEER, and CERTIFYING <br />ENGINEER. CONTRACTOR shall remove oversize materials from fills at no additional <br />cost to CC&V. <br />B. Select Structural Fill <br />2. CONTRACTOR shall condition and compact the Select Structural Fill using a method <br />specification on 3‐foot thick lifts that result in a firm surface that will be approved <br />by the CERTIFYING ENGINEER. <br />C. Coarse Shaft Backfill <br />1. Coarse Shaft Backfill shall be placed in the underground workings as part of <br />remediation, as shown in the DRAWINGS. <br />2. CONTRACTOR shall compact and condition the final surface of the Coarse Shaft <br />Backfill using a method specification that results in a firm surface that will be <br />approved by CERTIFYING ENGINEER.
The URL can be used to link to this page
Your browser does not support the video tag.