My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-31_REVISION - M1980244 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-08-31_REVISION - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2016 3:51:10 PM
Creation date
10/25/2016 1:35:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/31/2016
Doc Name
Specifications - Adequacy Review Response
From
CC&V
To
DRMS
Type & Sequence
TR78
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 02210.DOCX <br />Squaw Gulch VLF <br />Project No.475.0106.006 <br />August 25, 2016 <br /> <br /> <br /> <br />Page 1 <br />SECTION 02210.0 UNDERGROUND WORKING REMEDIATION <br />1. PART 1: GENERAL <br />1.1. Summary <br />This SPECIFICATION describes the activities associated with the remediation of the underground <br />workings located within the limits of the valley leach facility. <br />1.2. Related Sections <br />Refer to the following Sections for related work: <br /> Section 02200.0 ‐ Earthworks <br /> Section 03300.0 ‐ Cast In Place Concrete <br /> Section 03310.0 ‐ Cemented Rockfill <br />1.3. Quality Assurance <br />A. All work shall be monitored and tested in compliance with the requirements of the <br />SPECIFICATIONS. <br />B. All CQA soils testing (both field and laboratory testing) will be the responsibility of CQA <br />Monitor, as identified in the Earthworks CQA plan. CONTRACTOR shall be responsible <br />for cooperating with CQA Monitor during all testing activities. CONTRACTOR shall <br />provide equipment and labor to assist CQA Monitor in sampling, if requested, and shall <br />also provide access to all areas requiring testing activities. Quality Control testing shall <br />be the responsibility of the CONTRACTOR. <br />C. All excavation, backfill, and grading operations shall be carried out under the <br />observation of MANAGER and CERTIFYING ENGINEER. <br />D. Any work found unsatisfactory or any work disturbed by subsequent operations before <br />acceptance is granted shall be corrected by CONTRACTOR, at its sole cost. <br />1.4. Submittals <br />A. CONTRACTOR shall provide method of Coarse Shaft Backfill and Select Structural Fill <br />placement. <br />B. CONTRACTOR shall provide method of compacting Native material, Coarse Shaft <br />Backfill, and Select Structural Fill, to meet the compaction requirements identified in <br />Sections 3.02 and 3.03. <br />C. CONTRACTOR shall provide blasting design for approval by MANAGER.
The URL can be used to link to this page
Your browser does not support the video tag.